Market Notices

98652RESERVE NOTICE20/06/2022 03:09:37 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the NSW Region on 21/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the NSW region advised in AEMO Electricity Market Notice No. 98637 has been updated at 1430 hrs to the following:

[1.] From 1800 hrs 21/06/2022 to 1830 hrs 21/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 27 MW at 1800 hrs.

[2.] From 2000 hrs 21/06/2022 to 2030 hrs 21/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 387 MW at 2000 hrs.


AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1730 hrs on 21/06/2022.

AEMO Operations
98651RESERVE NOTICE20/06/2022 03:06:52 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the Vic Region begining on 21/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the Vic region advised in AEMO Electricity Market Notice No. 98636 has been updated at 1430 hrs to the following:

[1.] From 1800 hrs 21/06/2022 to 2030 hrs 21/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 546 MW at 2000 hrs.


AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1730 hrs on 21/06/2022.

AEMO Operations
98648RESERVE NOTICE20/06/2022 02:36:29 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the QLD Region on 21/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the QLD region advised in AEMO Electricity Market Notice No. 98621 has been updated at 1400 hrs to the following

[1.] From 1730 hrs 21/06/2022 to 1900 hrs 21/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 345 MW at 1800 hrs.

[2.] From 2000 hrs 21/06/2022 to 2030 hrs 21/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 378 MW at 2000 hrs.

[3.] From 2100 hrs 21/06/2022 to 2130 hrs 21/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 117 MW at 2100 hrs.


AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1700 hrs on 21/06/2022

AEMO Operations
98638RESERVE NOTICE20/06/2022 02:37:25 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region on 21/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the SA region advised in AEMO Electricity Market Notice No. 98635 has been updated at 1400 hrs to the following:

[1.] From 1730 hrs 21/06/2022 to 2030 hrs 21/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 877 MW at 1830 hrs.

[2.] From 2100 hrs 21/06/2022 to 2130 hrs 21/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 117 MW at 2100 hrs.


AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1700 hrs on 21/06/2022.

AEMO Operations
98637RESERVE NOTICE20/06/2022 02:38:06 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the NSW Region on 21/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the NSW region advised in AEMO Electricity Market Notice No. 98623 has been updated at 1400 hrs to the following:

[1.] From 1730 hrs 21/06/2022 to 1900 hrs 21/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 349 MW at 1800 hrs.

[2.] From 2000 hrs 21/06/2022 to 2030 hrs 21/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 726 MW at 2000 hrs.

[3.] From 2100 hrs 21/06/2022 to 2130 hrs 21/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 117 MW at 2100 hrs.


AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1700 hrs on 21/06/2022.

AEMO Operations
98636RESERVE NOTICE20/06/2022 02:25:55 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the Vic Region begining on 21/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the Vic region advised in AEMO Electricity Market Notice No. 98617 has been updated at 1330 hrs to the following:

[1.] From 1730 hrs 21/06/2022 to 2230 hrs 21/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1753 MW at 2030 hrs.

[2.] From 2330 hrs 21/06/2022 to 0000 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 90 MW at 2330 hrs.


AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1700 hrs on 21/06/2022.

AEMO Operations
98635RESERVE NOTICE20/06/2022 02:08:42 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region begining on 21/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the SA region advised in AEMO Electricity Market Notice No. 98633 has been updated at 1330 hrs to the following:

[1.] From 1730 hrs 21/06/2022 to 2230 hrs 21/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1443 MW at 1830 hrs.

[2.] From 2330 hrs 21/06/2022 to 0000 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 90 MW at 2330 hrs.


AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1700 hrs on 21/06/2022.

AEMO Operations
98633RESERVE NOTICE20/06/2022 01:45:36 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region begining on 21/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the SA region advised in AEMO Electricity Market Notice No. 98616 has been updated at 1300 hrs to the following:

[1.] From 1730 hrs 21/06/2022 to 2300 hrs 21/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1443 MW at 1830 hrs.

[2.] From 2330 hrs 21/06/2022 to 0000 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 307 MW at 2330 hrs.


AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1700 hrs on 21/06/2022.

AEMO Operations
98623RESERVE NOTICE20/06/2022 01:25:14 PM

PDPASA - Forecast Lack Of Reserve Level 3 (LOR3) in the NSW Region beginning on 21/06/2022

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR3 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:

[1.] From 1730 hrs 21/06/2022 to 1930 hrs 21/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 426 MW at 1730 hrs.

[2.] From 2000 hrs 21/06/2022 to 2230 hrs 21/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 2598 MW at 2000 hrs.

[3.] From 2330 hrs 21/06/2022 to 0000 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 178 MW at 2330 hrs.


AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1700 hrs on 21/06/2022.

AEMO Operations