PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the Qld Region on 12/04/2023
AEMO ELECTRICITY MARKET NOTICE
The Forecast LOR1 condition in the Qld region advised in AEMO Electricity Market Notice No. 107413 has been updated at 0815 hrs to the following:
[1.] From 1730 hrs 12/04/2023 to 2030 hrs 12/04/2023.
The forecast capacity reserve requirement is 1193 MW.
The minimum capacity reserve available is 741 MW.
[2.] From 2100 hrs 12/04/2023 to 2130 hrs 12/04/2023.
The forecast capacity reserve requirement is 1190 MW.
The minimum capacity reserve available is 1072 MW.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the Qld Region on 12/04/2023
AEMO ELECTRICITY MARKET NOTICE
The Forecast LOR1 condition in the Qld region advised in AEMO Electricity Market Notice No. 107399 has been updated at 0540 hrs to the following:
[1.] From 1730 hrs 12/04/2023 to 2030 hrs 12/04/2023.
The forecast capacity reserve requirement is 1109 MW.
The minimum capacity reserve available is 596 MW.
[2.] From 2100 hrs 12/04/2023 to 2130 hrs 12/04/2023.
The forecast capacity reserve requirement is 1107 MW.
The minimum capacity reserve available is 936 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 12/04/2023
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
[1.] From 1730 hrs 12/04/2023 to 2030 hrs 12/04/2023.
The forecast capacity reserve requirement is 1086 MW.
The minimum capacity reserve available is 648 MW.
[2.] From 2100 hrs 12/04/2023 to 2200 hrs 12/04/2023.
The forecast capacity reserve requirement is 1080 MW.
The minimum capacity reserve available is 839 MW.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the Qld Region on 11/04/2023
The Forecast LOR1 condition in the Qld region advised in AEMO Electricity Market Notice No. 107392 has been updated at 1449 hrs 11/04/2023 to the following:
From 1730 hrs 11/04/2023 to 2000 hrs 11/04/2023.
The forecast capacity reserve requirement is 1089 MW.
The minimum capacity reserve available is 818 MW.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 17/04/2023
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
From 1730 hrs to 1800 hrs 17/04/2023.
The forecast capacity reserve requirement is 1128 MW.
The minimum capacity reserve available is 1119 MW.
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the Qld Region on 11/04/2023
The Forecast LOR1 condition in the Qld region advised in AEMO Electricity Market Notice No. 107389 has been updated at 0514 hrs 11/04/2023to the following:
[1.] From 1730 hrs 11/04/2023 to 1900 hrs 11/04/2023.
The forecast capacity reserve requirement is 1071 MW.
The minimum capacity reserve available is 931 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 11/04/2023
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
[1.] From 1800 hrs 11/04/2023 to 1830 hrs 11/04/2023.
The forecast capacity reserve requirement is 1049 MW.
The minimum capacity reserve available is 1028 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 05/04/2023
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 107246 is cancelled at 1630 hrs 05/04/2023
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 05/04/2023
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
[1.] From 1730 hrs 05/04/2023 to 1900 hrs 05/04/2023.
The forecast capacity reserve requirement is 1124 MW.
The minimum capacity reserve available is 1054 MW.
Manager NEM Real Time Operations