93066RESERVE NOTICE09/12/2021 05:19:20 PM

Actual Lack Of Reserve Level 1 (LOR1) in the QLD Region on 09/12/2021

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 09/12/2021

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1700 hrs.

The Actual LOR1 condition is forecast to exist until 2000 hrs.

The forecast capacity reserve requirement is 1089 MW.
The minimum capacity reserve available is 763 MW.


Manager NEM Real Time Operations
92254RESERVE NOTICE08/11/2021 07:26:53 PM

Cancellation of Actual (LOR1) condition in the QLD region - 8/11/2021

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the QLD region - 8/11/2021

The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice 92253 is cancelled at 1900 hrs 8/11/2021

Manager NEM Real Time Operations
92253RESERVE NOTICE08/11/2021 06:23:06 PM

PDPASA - Actual Lack Of Reserve Level 1 (LOR1) in the QLD Region on 08/11/2021

PDPASA - Actual Lack Of Reserve Level 1 (LOR1) in the QLD Region on 08/11/2021

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 08/11/2021

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1800 hrs.

The Actual LOR1 condition is forecast to exist until 2000 hrs.

The forecast capacity reserve requirement is 1186 MW.
The minimum capacity reserve available is 952 MW.


Manager NEM Real Time Operations
92065RESERVE NOTICE30/10/2021 07:18:29 PM

Cancellation of Actual (LOR1) condition in the QLD region - 30/10/2021

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the QLD region - 30/10/2021

The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No.92063 is cancelled at 1915 hrs 30/10/2021

Manager NEM Real Time Operations
92063RESERVE NOTICE30/10/2021 05:49:19 PM

Actual Lack Of Reserve Level 1 (LOR1) in the QLD Region on 30/10/2021

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 30/10/2021

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1730 hrs.

The Actual LOR1 condition is forecast to exist until 1930 hrs.

The forecast capacity reserve requirement is 1015 MW.
The minimum capacity reserve available is 813 MW.


Manager NEM Real Time Operations
92020RESERVE NOTICE28/10/2021 08:19:51 PM

Cancellation of Actual (LOR1) condition in the QLD region - 28/10/2021

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the QLD region - 28/10/2021

The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No.92009 is cancelled at 2015 hrs 28/10/2021

Manager NEM Real Time Operations
92009RESERVE NOTICE28/10/2021 05:48:58 PM

PDPASA - Actual Lack Of Reserve Level 1 (LOR1) in the QLD Region on 28/10/2021

PDPASA - Actual Lack Of Reserve Level 1 (LOR1) in the QLD Region on 28/10/2021

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 28/10/2021

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1730 hrs.

The Actual LOR1 condition is forecast to exist until 1830 hrs.

The forecast capacity reserve requirement is 1004 MW.
The minimum capacity reserve available is 602 MW.


Manager NEM Real Time Operations
91978RESERVE NOTICE26/10/2021 07:50:42 PM

PDPASA - Cancellation of Actual (LOR1) condition in the QLD region - 26/10/2021

AEMO ELECTRICITY MARKET NOTICE

PDPASA - Cancellation of Actual (LOR1) condition in the QLD region - 26/10/2021

The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No 91976 is cancelled at 1930 hrs 26/10/2021

Manager NEM Real Time Operations





91976RESERVE NOTICE26/10/2021 06:25:49 PM

PDPASA - Actual Lack Of Reserve Level 1 (LOR1) in the QLD Region on 26/10/2021

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 26/10/2021

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1800 hrs.

The Actual LOR1 condition is forecast to exist until 1900 hrs.

The forecast capacity reserve requirement is 942 MW.
The minimum capacity reserve available is 844 MW.


Manager NEM Real Time Operations