101619RESERVE NOTICE12/09/2022 07:24:26 AM

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region on 12/09/2022

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 12/09/2022

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the SA region from 0700 hrs.

The Actual LOR1 condition is forecast to exist until 0730 hrs.

The forecast capacity reserve requirement is 570 MW.
The minimum capacity reserve available is 559 MW.


Manager NEM Real Time Operations
101612RESERVE NOTICE11/09/2022 08:47:56 PM

Cancellation of Actual (LOR1) condition in the SA region - 11/09/2022

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the SA region - 11/09/2022

The Actual LOR1 Condition in the SA Region advised in AEMO Electricity Market Notice No.101610 is cancelled at 2045 hrs 11/09/2022.

Manager NEM Real Time Operations
101611RESERVE NOTICE11/09/2022 07:22:48 PM

Cancellation of Actual (LOR1) condition in the QLD region - 11/09/2022

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the QLD region - 11/09/2022

The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No.101609 is cancelled at 1915 hrs 11/09/2022.

Manager NEM Real Time Operations
101610RESERVE NOTICE11/09/2022 07:19:21 PM

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region on 11/09/2022

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 11/09/2022

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the SA region from 1900 hrs.

The Actual LOR1 condition is forecast to exist until 2000 hrs.

The forecast capacity reserve requirement is 552 MW.
The minimum capacity reserve available is 485 MW.


Manager NEM Real Time Operations
101609RESERVE NOTICE11/09/2022 06:08:55 PM

Actual Lack Of Reserve Level 1 (LOR1) in the QLD Region on 11/09/2022

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 11/09/2022

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1730 hrs.

The Actual LOR1 condition is forecast to exist until 2000 hrs.

The forecast capacity reserve requirement is 914 MW.
The minimum capacity reserve available is 664 MW.


Manager NEM Real Time Operations
101597RESERVE NOTICE10/09/2022 09:49:49 PM

Cancellation of Actual (LOR1) condition in the SA region - 10/09/2022

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the SA region - 10/09/2022

The Actual LOR1 Condition in the SA Region advised in AEMO Electricity Market Notice No.101596 is cancelled at 2145 hrs 10/09/2022.

Manager NEM Real Time Operations
101596RESERVE NOTICE10/09/2022 06:54:22 PM

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region on 10/09/2022

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 10/09/2022

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the SA region from 1830 hrs.

The Actual LOR1 condition is forecast to exist until 2230 hrs.

The forecast capacity reserve requirement is 553 MW.
The minimum capacity reserve available is 355 MW.


Manager NEM Real Time Operations
101554RESERVE NOTICE08/09/2022 01:49:38 AM

Cancellation of Actual (LOR1) condition in the SA region - 08/09/2022

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the SA region - 08/09/2022

The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No.101553 is cancelled at 0145 hrs 08/09/2022.

Manager NEM Real Time Operations
101553RESERVE NOTICE08/09/2022 12:47:29 AM

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region on 08/09/2022

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 08/09/2022

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the SA region from 0030 hrs.

The Actual LOR1 condition is forecast to exist until 0130 hrs.

The forecast capacity reserve requirement is 471 MW.
The minimum capacity reserve available is 248 MW.