Cancellation of Actual (LOR1) condition in the NSW region - 11/02/2023
Cancellation of Actual (LOR1) condition in the NSW region - 11/02/2023
The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.105795 is cancelled at 1900 hrs 11/02/2023.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region on 11/02/2023
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 11/02/2023
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1800 hrs.
The Actual LOR1 condition is forecast to exist until 1830 hrs.
The forecast capacity reserve requirement is 1350 MW.
The minimum capacity reserve available is 1314 MW.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the SA region - 09/02/2023
Cancellation of Actual (LOR1) condition in the SA region - 09/02/2023
The Actual LOR1 Condition in the SA Region advised in AEMO Electricity Market Notice No.105751 is cancelled at 2016 hrs 09/02/2023.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 09/02/2023
Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 09/02/2023
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the SA region from 1900 hrs.
The Actual LOR1 condition is forecast to exist until 2030 hrs.
The forecast capacity reserve requirement is 567 MW.
The minimum capacity reserve available is 360 MW.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the QLD Region - 03/02/2023
The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No.105602 is cancelled at 2100 hrs 03/02/2023.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the QLD Region on 03/02/2023
Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 03/02/2023
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1815 hrs.
The Actual LOR1 condition is forecast to exist until 1900 hrs.
The forecast capacity reserve requirement is 1047 MW.
The minimum capacity reserve available is 989 MW.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the QLD Region - 03/02/2023
The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No.105591 is cancelled at 1745 hrs 03/02/2023.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the QLD region on 03/02/2023
Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 03/02/2023
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1600 hrs.
The Actual LOR1 condition is forecast to exist until 2100 hrs.
The forecast capacity reserve requirement is 1152 MW.
The minimum capacity reserve available is 768 MW.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the NSW region - 02/02/2023
The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.105532 is cancelled at 1940 hrs 02/02/2023.
Manager NEM Real Time Operations