Market Notices

55844INTER-REGIONAL TRANSFER26/11/2016 10:44:04 AM

Planned outage of Heywood to South East No.1 275 kV line in South Australia and Victoria regions from 22/11/2016 0700 hrs to 26/11/2016 1700 hrs

AEMO ELECTRICITY MARKET NOTICE.

Refer Market Notice 55466

The Heywood to South East No.1 275 kV transmission liine in South Australia and Victoria regions was returned to service early at 1000 hrs on 26/11/2016.

The following constraint sets have been revoked at 1000hrs 26/11/2016:

F-I-HYSE (includes F-S_LREG_0035 and F-S_RREG_0035)
I-HYSE
S-X_BC_CP
V-HYTX_M12

The constraint sets contain equations with the following interconnectors on the LHS

NSW1-QLD1
N-Q_MNSP1
VIC1-NSW1
V-S_MNSP1
VIC1-SA1

Refer AEMO Network Outage Schedule (NOS) for further details.

Manager NEM Real Time Operations
55827INTER-REGIONAL TRANSFER23/11/2016 02:05:23 PM

Cancellation - Inter-regional transfer limit variation - South East No1 275kV SVC - SA Region,

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Inter-regional transfer limit variation - South East No1 275kV SVC - SA Region,
Refer to MN 55826

The SESS No1 275kV SVC (SA) restored at 1353 hrs,


The following constraint sets were revoked

S-SE_VC1_BC-2P
V-2RP

The constraint sets contain equations with the following interconnectors on the LHS.
NSW1-QLD1
N-Q_MNSP1
VIC1-NSW1
V-S_MNSP1
VIC1-SA1

Refer to Network Outage Scheduler (NOS) for further details

Manager NEM Real Time Operations
55826INTER-REGIONAL TRANSFER23/11/2016 01:22:23 PM

Inter-regional transfer limit variation - South East No1 275kV SVC - SA Region,

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - South East No1 275kV SVC- SA Region,

An unplanned outage of the SESS No1 275kV SVC (SA) occurred at 1258 hrs,

The following constraint sets were invoked

S-SE_VC1_BC-2P
V-2RP

The constraint sets contain equations with the following interconnectors on the LHS.
NSW1-QLD1
N-Q_MNSP1
VIC1-NSW1
V-S_MNSP1
VIC1-SA1

Refer to Network Outage Scheduler (NOS) for further details

Manager NEM Real Time Operations
55797INTER-REGIONAL TRANSFER21/11/2016 03:43:20 PM

Inter-Regional Transfer Limit Variation - APD - Heywood No. 1 500 kV Line (Vic region) - 21/11/16

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer Limit Variation - APD - Heywood No. 1 500 kV Line (Vic region) - 21/11/16

The planned outage of the APD - Heywood No. 1 500 kV Line has completed early.

The following constraint set was revoked at 15:40 hrs.
V-APHY1_2

ThIS constraint set contains equations with the following interconnectors on the LHS.

V-SA

Refer to AEMO Network Outage Schedule (NOS) for further details.

Manager NEM Real Time Operations
55783INTER-REGIONAL TRANSFER20/11/2016 09:48:20 PM

Update - Inter-Regional Transfer limit variation Murraylink

AEMO ELECTRICITY MARKET NOTICE

Update - Inter-Regional Transfer limit variation Murraylink - 20/11/2016

Refer AEMO Electricity Market Notice 55782

The power flow on the Murraylink interconnector is now following the value determined by the NEM dispatch algorithm.

The Constraint Set I-CTRL_ISSUE_ML was revoked from 2145 hrs.

This Constraint Set contains an equation with the following interconnector on the LHS.

V-S-MNSP1

Manager NEM Real Time Operations
55782INTER-REGIONAL TRANSFER20/11/2016 08:40:40 PM

Inter-Regional Transfer limit variation Murraylink

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer limit variation Murraylink - 20/11/2016

The power flow on the Murraylink interconnector is not following the value determined by the NEM dispatch algorithm.

The Constraint Set I-CTRL_ISSUE_ML was invoked from 2040 hrs.

This Constraint Set contains an equation with the following interconnector on the LHS.

V-S-MNSP1

Manager NEM Real Time Operations
55781INTER-REGIONAL TRANSFER20/11/2016 10:21:33 AM

Inter-regional transfer limit variation - Murraylink 20/11/16

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Murraylink 20/11/16

Update to Market Notice 55778

Murraylink has been returned to service.

The following constraint set was revoked at 1010 hrs.

I-ML_ZERO

The constraint set contains equations with the following interconnectors on the LHS.

V-S-MNSP1


Manager NEM Real Time Operations
55780INTER-REGIONAL TRANSFER20/11/2016 08:01:06 AM

Inter-Regional Transfer Limit Variation - Kemps Creek No. 3 500 kV Transformer (NSW region) - 20/11/16

AEMO ELECTRICITY MARKET NOTICE

Update to Market Notice 55779

Inter-Regional Transfer Limit Variation - Kemps Creek No. 3 500 kV Transformer (NSW region) - 20/11/16

The planned outage of the Kemps Creek No. 3 500 kV Transformer has been rescheduled to start at 0730 hrs 20/11/16.

The following constraint set was invoked for this outage.
N-KC_TX

The constraint set contains equations with the following interconnectors on the LHS.

N-Q-MNSP1
NSW1-QLD1
VIC1-NSW1

Refer to AEMO Network Outage Schedule (NOS) for further details.

Manager NEM Real Time Operations
55779INTER-REGIONAL TRANSFER20/11/2016 06:50:44 AM

Inter-Regional Transfer Limit Variation - Kemps Creek No. 3 500 kV Transformer (NSW region) - 20/11/16

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer Limit Variation - Kemps Creek No. 3 500 kV Transformer (NSW region) - 20/11/16

The planned outage of the Kemps Creek No. 3 500 kV Transformer starting at 0615 hrs 20/11/16 has been cancelled.

The following constraint set was invoked for this outage.
N-KC_TX

The constraint set contains equations with the following interconnectors on the LHS.

N-Q-MNSP1
NSW1-QLD1
VIC1-NSW1

Refer to AEMO Network Outage Schedule (NOS) for further details.