Inter-regional transfer limit variation Chapel Street - Gordon No. 1 220 kV transmission line - TAS region 04/09/17
Inter-regional transfer limit variation Chapel Street - Gordon No. 1 220 kV transmission line - TAS region 04/09/17
There was a short notice outage of the Chapel Street - Gordon No. 1 220 kV transmission line at 2242 hrs, 04/09/2017.
The following constraint sets were invoked at 2240 hrs until further notice.
F-T-CSGO
T-CSGO
The constraint sets contain equations with the following interconnectors on the LHS.
T-V-MNSP1
Refer to AEMO Network Outage Scheduler (NOS) for more details.
Manager NEM Real Time Operations
Cancellation - Inter-regional transfer limit variation Chapel Street - Gordon No. 1 220 kV transmission line - TAS region 04/09/17
Cancellation - Inter-regional transfer limit variation Chapel Street - Gordon No. 1 220 kV transmission line - TAS region 04/09/17
Refer to AEMO Electricity Market Notice 59136
The Chapel Street - Gordon No. 1 220 kV transmission line has been returned to service
The following constraint sets were revoked at 1010 hrs.
F-T-CSGO
T-CSGO
The constraint sets contain equations with the following interconnectors on the LHS.
T-V-MNSP1
Refer to AEMO Network Outage Scheduler (NOS) for more details.
Manager NEM Real Time Operations
Inter-regional transfer limit variation Chapel Street - Gordon No. 1 220 kV transmission line - TAS region 04/09/17
Inter-regional transfer limit variation Chapel Street - Gordon No. 1 220 kV transmission line - TAS region 04/09/17
There was a short notice outage of the Chapel Street - Gordon No. 1 220 kV transmission line at 0843 hrs, 04/09/17.
The following constraint sets were invoked at 0845 hrs until further notice.
F-T-CSGO
T-CSGO
The constraint sets contain equations with the following interconnectors on the LHS.
T-V-MNSP1
Refer to AEMO Network Outage Scheduler (NOS) for more details.
Manager NEM Real Time Operations
Management of South Australia Power System Security - Severe Weather Warning - Saturday, 2 September 2017
Management of South Australia Power System Security - Severe Weather Warning - Saturday, 2 September 2017
AEMO has determined that the severe weather warning issued by the BOM presents an added risk to the power system in South Australia.
To manage power system security, AEMO has applied a network constraint to limit the flow on the VIC-SA interconnector in the Victoria to South Australia direction.
The following constraint set was invoked at 1700 hrs and will remain in place until further notice.
I-VS_250
The constraint set contains equations with the following interconnectors on the LHS.
V-SA
Manager NEM Real Time Operations
Inter-regional transfer limit variation South Australia region. South East substation No1 and No2 SVCs. Saturday, 2 September 2017
Inter-regional transfer limit variation South Australia region. South East substation No1 and No2 SVCs. Saturday, 2 September 2017
To manage power system security in the South Australia region the planned outage of the South East Substation No1 and No2 SVCs from 0800 hrs to 1800 hrs 02/09/2017 has been cancelled.
The following constraint set was revoked at 0720 hrs.
S-X_PA_VC_2
The constraint set contains equations with the following interconnectors on the LHS.
V-SA
V-S-MNSP1
Refer to AEMO Network Outage Scheduler for further details.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Vic Region - 1/09/2017
Inter-regional transfer limit variation - Vic Region 1/09/2017
Unplanned outage of the Rowville to Sth Morang to Keilor 500 kV connection from 1237 hrs to 1307 hrs
Refer to MN 59108
The following constraint sets were invoked
V-ROSM from 1245 and 1315 hrs
V-KTSM_R from 1250 and 1315 hrs
The constraint set contains equations with the following interconnectors on the LHS.
T-V-MNSP1
V-S-MNSP1
V-SA
VIC1-NSW1
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Murraylink, Friday 01 September 2017
Inter-regional transfer limit variation - Murraylink Interconnector
Unplanned outage of Murraylink interconnector at 0306 hrs, Friday 01 September 2017
The following constraint set was invoked at 0310 hrs until further notice.
I-ML_ZERO
The constraint set contains equations with the following interconnectors on the LHS.
V-S-MNSP1
Refer to AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
Cancellation: Inter-regional transfer limit variation Eildon - Mount Beauty No 2 220 kV line (VIC) - Voltage Control
Cancellation: Inter-regional transfer limit variation Eildon - Mount Beauty No 2 220 kV line (VIC) - Voltage Control
Refer Market Notice 59099.
The Eildon - Mount Beauty No 2 220 kV line has been returned to service.
The following constraint set was revoked at 1605 hrs:
V-EPMB
The constraint set contain equations with the following interconnectors on the LHS.
T-V-MNSP1
V-S-MNSP1
V-SA
VIC1-NSW1
Manager NEM Real Time Operations
Inter-regional transfer limit variation Eildon - Mount Beauty No 2 220 kV line (VIC) - Voltage Control
Inter-regional transfer limit variation Eildon - Mount Beauty No 2 220 kV line (VIC) - Voltage Control
The Eildon - Mount Beauty No 2 220 kV line has been de-energised to manage voltages during the planned outage of the Eildon - Thomastown 220kV line in the VIC region
The following constraint set was invoked at 1145 hrs until 1630 hrs.
V-EPMB
The constraint sets contain equations with the following interconnector on the LHS.
T-V-MNSP1
V-S-MNSP1
V-SA
VIC1-NSW1
See Network Outage Scheduler (NOS) for further details
Manager NEM Real Time Operations