Possible intervention to manage power system security In South Australia (SA) Region
Possible intervention to manage power system security In South Australia (SA) Region
The synchronous generating units expected to be synchronised in SA from 2230 hrs 27/03/2018 to 0600 hrs 28/03/2018 in Pre-dispatch published at 1230 hrs 27/03/2018 are inadequate to maintain sufficient fault levels in SA and hence a secure operating state.
AEMO currently estimates that, in the absence of sufficient market response by 2100 hrs 27/03/2018, AEMO may need to issue a Direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised from 2230 hrs 27/03/2018 to 0600 hrs 28/03/2018 to maintain sufficient fault levels in SA.
Manager NEM Real Time Operations
Update - Possible Intervention to manage power system security In South Australia (SA) Region - 24/03/18.
Refer AEMO Electricity Market Notice 61799
The synchronous generating units expected to be synchronised in SA from 2000 hrs 24/03/18 to 0700 hrs 26/03/18 in Pre-dispatch published at 1300 hrs 24/03/18 are insufficient to maintain system strength in SA.
Refer:
http://www.aemo.com.au/-/media/Files/Electricity/NEM/Security_and_Reliability/Congestion-Information/2017/Transfer-Limit-Advice---South-Australian-System-Strength.pdf
AEMO currently estimates that, in the absence of sufficient market response by 1350 hrs 24/03/18, AEMO may need to issue a Direction requiring one or more SA synchronous generating unit(s) to return to service or remain synchronised from 2030 hrs 24/03/18 to 0700 hrs 26/03/18, to maintain sufficient system strength in SA.
Manager NEM Real Time Operations
Possible intervention to manage power system security In South Australia (SA) Region
The synchronous generating units expected to be synchronised in SA from 2000 hrs 24/03/18 to 0600 hrs 26/03/18 in Pre-dispatch published at 1400 hrs 23/03/18 are insufficient to maintain system strength in SA.
Refer:
http://www.aemo.com.au/-/media/Files/Electricity/NEM/Security_and_Reliability/Congestion-Information/2017/Transfer-Limit-Advice---South-Australian-System-Strength.pdf
AEMO currently estimates that, in the absence of sufficient market response by 1900 hrs 24/03/18, AEMO may need to issue a Direction requiring one or more SA synchronous generating unit(s) to return to service or remain synchronised from 2000 hrs 24/03/18 to 0600 hrs 26/03/18, to maintain sufficient system strength in SA.
Manager NEM Real Time Operations
Possible intervention to manage power system security In South Australia (SA) Region
The synchronous generating units expected to be synchronised in SA from 2100 hrs 20/03/18 to 0600 hrs 21/03/18 in Pre-dispatch published at 1430 hrs 20/03/18 are sufficient to maintain system strength in SA however following a credible contingency event AEMO will not be able to return SA to a secure operating state within 30 minutes.
Refer: http://www.aemo.com.au/-media/Files/Electricity/NEM/Security_and_Reliability/Congestion-Information/2017/Transfer-Limit-Advice---South-Australian-System-Strength.pdf
AEMO currently estimates that, in the absence of sufficient market response by 2000 hrs 20/03/18, AEMO may need to issue a Direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised from 2100 hrs 20/03/18 to 0600 hrs 21/03/18 , to maintain power system security sufficient system strength in SA.
Manager NEM Real Time Operations
Planned outage at South East substation in SA region on 22/03/2018 requiring a reclassification
The South East 275 kV No.1 SVC in South Australia (SA) region is planned to be out of service from 1300 hrs on 22/03/2018 to 1330 hrs on 22/03/2018.
During this outage, the trip of the South East - Tailem Bend No.1 and No.2 275 kV lines will be reclassified as a credible contingency due to temporary protection arrangements required during this outage. SA will remain connected to the rest of the NEM via the 275kV and the 132kV network.
A credible contingency of loss of both South East - Tailem Bend 275 kV lines during this planned outage will sever the 275kV connections between the NEM and SA. If SA remains connected to the NEM via the 132kV network, this will pose a system security issue.
If the above credible contingency occurs, 35 MW of raise and lower regulation FCAS will be sourced from within SA.
In addition, AEMO will take all necessary steps as outlined in Section 6.1 of SO_OP_3715 Power System Security Guideline to separate the 132kV network and therefore manage an orderly separation of SA from the NEM.
Ryan Burge
AEMO Operations
Update - Vulnerable Lines - Tas Region
Refer to Market Notice 61604
The cause of this event has been identified as due to Lightning.
In accordance with SO_OP_3715 section 11, AEMO now considers the Tungatina - New Norfolk tee Meadowbank No. 1 and No. 2 110 kV Lines to be Vulnerable with a category of probable due to Lightning.
Manager NEM Real Time Operations
Update - Vulnerable Lines - Qld Region
Refer to Market Notice 61565
The cause of this event has been identified as due to Lightning.
In accordance with SO_OP_3715 section 11, AEMO now considers the Goonyella - North Goonyella Tee - Stoney Creek No. 7122 and the Goonyella - Newlands No. 7155 132 kV Lines to be Vulnerable with a category of probable due to Lightning.
Manager NEM Real Time Operations
Update - Non-credible contingency event - NSW region - 15/02/18
Refer market notice 61290
At 1339 hrs the Broken Hill 220 kV bus tripped which also disconnected the Broken Hill - Buronga X2 220 kV Line and the Broken Hill - Silverton X6 220 kV Line.
The cause of this non credible contingency event is known and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
Manager NEM Real Time Operations
Network Augmentation Commissioned NSW Region: - Broken Hill - Silverton X6 220 kV Line - 15/02/18.
A planned network augmentation has been commissioned in the NSW Region at 1035 hrs 15/02/18.
The Broken Hill - Silverton X6 220 kV Transmission Line has been energised.