Market Notices

76008CONSTRAINTS19/06/2020 09:01:44 AM

Update to system strength requirements in North Queensland

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 75482

AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland. A revision to the requirements will be implemented at 1100hrs today.

Combination 6 has been revised and is now:
3 x Stanwell, 2 x Callide B + C, 3 x Gladstone, 9 x Total Stanwell+Callide+Gladstone, 4 x Kareeya: 50% output for Sun Metals and Haughton and 65% output for Mt Emerald WF

If these combinations are not met all three generators have a limit of 0 MW and 0 inverters.

The constraint equations are: Q_NIL_STRGTH_MEWF, Q_NIL_STRGTH_HAUSF, Q_NIL_STRGTH_SMSF.

For further details please contact James Lindley at james.lindley@aemo.com.au or Simon Taylor at businessdevelopment@powerlink.com.au

Mya San
AEMO Operations
75784CONSTRAINTS22/05/2020 11:26:07 AM

New system normal constraint equation in Victoria for voltage collapse on trip of Ballarat - Waubra - Ararat line

AEMO ELECTRICITY MARKET NOTICE

In the event of a trip of the Ballarat - Waubra - Ararat 220 kV line the Ararat, Crowlands, Bulgana, Murra Warra and Waubra wind farms will be tripped off. AEMO has completed work on a revised voltage collapse limit for this contingency which will replace the existing 600 MW cap on these generators. FCAS constraint equations have also been developed for this contingency.

The energy constraint equation includes generators in south-west NSW and north-west Victoria on the left-hand side as well as VIC1-NSW1.

The following constraint equations will be implemented at 1000 hrs Monday 25th May 2020.
N^^V_NIL_ARWBBA
F_I+GFT_TG_R6
F_I+GFT_TG_R60
F_I+GFT_TG_R5
F_MAIN++GFT_TG_R6
F_MAIN++GFT_TG_R60
F_MAIN++GFT_TG_R5
F_MAIN+GFT_TG_R6
F_MAIN+GFT_TG_R60
F_MAIN+GFT_TG_R5

The following constraint equation will be removed:
V^V_NIL_ARWBBA

For further details on these new constraint equations please contact ben.blake@aemo.com.au

Ben Blake
AEMO Operations
75618CONSTRAINTS08/05/2020 11:49:59 AM

New system normal constraint equation in NSW for voltage collapse at Darlington Point

AEMO ELECTRICITY MARKET NOTICE

Following advice from TransGrid a new/revised system normal constraint equation

TransGrid has advised AEMO of a new voltage collapse limit in southern NSW. The voltage collapse occurs at Darlington Point on loss of the Darlington Point to Wagga (63) 330 kV line. The limit is for pre-contingent flow on 63 line. The constraint equation includes generators in south-west NSW and north-west Victoria on the left-hand side as well as Murraylink.

The following constraint equation will be implemented at 1000 hrs Monday 11th May 2020:
N^^N_NIL_2

For further details on this new constraint equation please contact ben.blake@aemo.com.au

Ben Blake
AEMO Operations
75482CONSTRAINTS27/04/2020 12:59:44 PM

Update to system strength requirements in North Queensland

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 75226

AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland. A revision to the requirements will be implemented at 1400 hrs today.

The revised minimum generator combinations and limits are:
1 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya, 2 x Barron Gorge: 100% output
2 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya, 1 x Barron Gorge: 80% output
3 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 2 x Kareeya, 1 x Townsville GT: 80% output
4 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 2 x Kareeya, 1 x Barron Gorge: 70% output
4H - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 2 x Kareeya, 1 x Barron Gorge, 50% or less output at Mt Emerald: 100% output for Haughton solar farm
5 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya: 70% output

The following new combination will also be implemented:
6- 3 x Stanwell, 2 x Callide C, 3 x Gladstone, 9 x Total Stanwell+Callide+Gladstone, 4 x Kareeya: 20% output

If these combinations are not met, Mt Emerald WF, Sun metals SF and Haughton SF have a limit of 0 MW and 0 inverters.

The constraint equations are: Q_NIL_STRGTH_MEWF, Q_NIL_STRGTH_HAUSF, Q_NIL_STRGTH_SMSF.

For further details please contact James Lindley at james.lindley@aemo.com.au or Simon Taylor at businessdevelopment@powerlink.com.au

Mya San
AEMO Operations
75226CONSTRAINTS06/04/2020 09:50:11 AM

Update to system strength requirements in North Queensland

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 74987

AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland. A revision to the requirements will be implemented at 1300 hrs today.

The revised minimum generator combinations and limits are:
1 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya, 2 x Barron Gorge: 100% output
2 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya, 1 x Barron Gorge: 80% output
3 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 2 x Kareeya, 1 x Townsville GT: 80% output
4 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 2 x Kareeya, 1 x Barron Gorge: 70% output
5 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya: 70% output

The following new combination will also be implemented:
4H - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 2 x Kareeya, 1 x Barron Gorge, 50% or less output at Mt Emerald: 100% output for Haughton solar farm. This new limit takes into account the current physical limitation on generation from Sun Metals Solar Farm.

If these combinations are not met all three generators have a limit of 0 MW and 0 inverters.

The constraint equations are: Q_NIL_STRGTH_MEWF, Q_NIL_STRGTH_HAUSF, Q_NIL_STRGTH_SMSF.

For further details please contact James Lindley at james.lindley@aemo.com.au or Simon Taylor at businessdevelopment@powerlink.com.au

Ben Blake
AEMO Operations
74987CONSTRAINTS19/03/2020 01:03:38 PM

Revised System Strength limits in North Queensland

AEMO ELECTRICITY MARKET NOTICE

AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland.

Through this work, AEMO and Powerlink have identified the need, depending on power system conditions, to constrain the output of three generators in North Queensland to maintain power system security.

The constraint equation is expected to limit generation from the three generators depending on power system conditions. The generators are Mt Emerald Wind Farm, Haughton Solar Farm and Sun Metals Solar Farm.

The constraint equations are: Q_NIL_STRGTH_MEWF, Q_NIL_STRGTH_HAUSF, Q_NIL_STRGTH_SMSF. These will be implemented at 1500hrs EST today.

The minimum generator combinations and limits are:
1 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 4 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya, 2 x Barron Gorge: 100% output
2 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 4 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya, 1 x Barron Gorge: 80% output
3 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 4 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 2 x Kareeya, 1 x Townsville GT: 80% output
4 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 4 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 2 x Kareeya, 1 x Barron Gorge: 70% output
5 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 4 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya: 70% output

If these combinations are not met all three generators have a limit of 0 MW and 0 inverters.

For further details please contact James Lindley at james.lindley@aemo.com.au or Simon Taylor at businessdevelopment@powerlink.com.au

Ben Blake
AEMO Operations
71869CONSTRAINTS17/12/2019 05:59:11 PM

Increase in Heywood from SA to Vic limit from 500 to 550 MW

AEMO ELECTRICITY MARKET NOTICE

As a part of the Heywood Interconnector upgrade the increase in the upper transfer limit from SA to Victoria is dependent on the commissioning of the over frequency generation scheme (OFGS). The OFGS has now been commissioned AEMO has completed and detailed analysis of power system limits at higher transfers.

AEMO will increase the Heywood limit from SA to Vic (from the current 500 MW) to 550 MW and the combined (Heywood and Murraylink) SA to Vic limit from 650 to 700 MW at 1000 hrs on 18 Dec 2019.

The following constraint sets will be revoked:
I-SV_500_TEST
I-SVS_650_TEST


The following constraint sets will be invoked:
I-SV_550_TEST
I-SVS_700_TEST

For more information on the increase:
ElectraNet 2019 APR: https://www.electranet.com.au/what-we-do/network/regulated-network-reports-and-studies/
Inter-network test program: https://www.aemo.com.au/media/Files/Electricity/Consultations/2015/HYTS%20interconnector%20upgrade%20internetwork.pdf

Ben Blake
AEMO Operations
65417CONSTRAINTS15/11/2018 01:43:40 PM

Reclassification of QNI SPAR as a credible contingency

AEMO MARKET NOTICE


After 25th August 2018 AEMO reclassified the loss of NSW to Qld (QNI) interconnected as a credible contingency when lightning is nearby (as per SO_OP_3715 section 11.4). The limits on QNI under this reclassification are based on the available FCAS in Queensland and NSW - normally the limit is between 300-400 MW in either direction.

Following an investigation TransGrid and Powerlink have made setting changes to the auto reclose settings on QNI and provided AEMO with a new reclassification limit on QNI. Now under similar conditions to 25th August the tripped single phases on QNI would reclose and NSW and Qld is not expected to separate.

The new limit of 850 MW will be activated at 1400 hrs November 15th 2018 for use in future reclassifications of QNI for a single phase fault on both circuits.

Constraint Set:
I-QNI_ONE_PHASE_N-2

Ben Blake
AEMO Operations
64203CONSTRAINTS13/09/2018 03:50:30 PM

Updated generator combinations for SA system strength

AEMO MARKET NOTICE

AEMO is continuing to investigate system strength requirements in South Australia.

AEMO has identified 14 additional combinations which meet minimum system strength requirements in South Australia.

New combinations:
LOW_39 - 1 x Pelican Point GT + ST + either Quarantine 5 or Dry Creek 1-3 + Mintaro
LOW_40 - 1 x Pelican Point GT + ST + Quarantine 5 + Dry Creek 1-3
LOW_41 - 2 x Pelican Point GT + ST + Osborne GT & ST
LOW_42 - 2 x Pelican Point GT + ST + Mintaro
LOW_43 - 2 x Pelican Point GT + ST + either Quarantine 5 or Dry Creek 1-3
LOW_44 - 4 x Torrens Island A unit + 1 x Pelican Point GT + ST
LOW_45A - 4 x Torrens Island A unit + Mintaro
LOW_45B - 4 x Torrens Island B unit + Mintaro
LOW_46 - 3 x Torrens Island A unit + 1 x Pelican Point GT + ST + Mintaro
LOW_47 - 3 x Torrens Island A unit + either Quarantine 5 or Dry Creek 1-3 + Mintaro
LOW_48A - 1 x Torrens Island A unit + Osborne GT & ST + either Quarantine 5 or Dry Creek 1-3 + Mintaro
LOW_48B - 1 x Torrens Island B unit + Osborne GT & ST + either Quarantine 5 or Dry Creek 1-3 + Mintaro
LOW_49 - 1 x Torrens Island A unit + 1 x Torrens Island B unit + Quarantine 5 + Dry Creek 1-3 + Mintaro
LOW_50 - 2 x Torrens Island A unit + Quarantine 5 + Dry Creek 1-3 + Mintaro

Replaced combinations:
LOW_25 - 3 x Torrens Island B unit + either Quarantine 5 or Dry Creek 1-3 + Mintaro
LOW_26 - 1 x Torrens Island A unit + 1 x Torrens Island B unit + Osborne GT & ST + Mintaro
LOW_30 - 2 x Torrens Island A unit + Osborne GT & ST + Mintaro
LOW_35 - 1 x Pelican Point GT + ST + Osborne GT & ST + Mintaro

Removed combinations:
LOW_23B
LOW_32
HIGH_14

For more information refer to the updated limits advice:
https://www.aemo.com.au/-/media/Files/Electricity/NEM/Security_and_Reliability/Congestion-Information/2018/Transfer-Limit-Advice---South-Australian-System-Strength.pdf

A further update to this advice is planned before the end of October 2018.