78621CONSTRAINTS08/10/2020 02:37:23 PM

Update to Vic to NSW voltage collapse limit

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 77600

AEMO has completed work on a revised system normal voltage stability limit at Victoria for flows from Victoria to New South Wales. This limit is to manage voltage collapse around Murray for the loss of all APD potlines.

The constraint equation includes generators in south-west NSW and north-west Victoria on the left-hand side as well as VIC1-NSW1. Full details on the limits advice are published on the AEMO website: https://www.aemo.com.au/energy-systems/electricity/national-electricity-market-nem/system-operations/congestion-information-resource/limits-advice

The constraint is most likely to bind when there is low Vic demands and high transfers to NSW. When it binds it will restrict Vic to NSW transfers and southern NSW generation.

This revised limit will be implemented to the following constraint equation at 1000 hrs Friday 9th October 2020.
V^^N_NIL_1

For further details on this constraint equation please contact terry.liu@aemo.com.au

Terry Liu
AEMO Operations
78616CONSTRAINTS08/10/2020 01:57:20 PM

Update to system strength requirements in North Queensland

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 77646

AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland.

A revision to the constraint equations will be implemented at 0900 hrs Friday 9th October 2020.

The new combinations are now published in a limits advice document on AEMO's website: For more information refer to the new limits advice: https://www.aemo.com.au/energy-systems/electricity/national-electricity-market-nem/system-operations/congestion-information-resource/limits-advice

This advice contains all the combinations for Queensland for system normal cases.

The constraint equations in the Q-NIL set of the form below will be modified:
Q_NIL_STRGTH_XXX


For further details please contact James Lindley at james.lindley@aemo.com.au or Simon Taylor at businessdevelopment@powerlink.com.au

Mya San
AEMO Operations
78615CONSTRAINTS08/10/2020 01:07:38 PM

New constraint for UFLS in South Australia

AEMO ELECTRICITY MARKET NOTICE

As part of a suite of recommendations to restore under frequency load shedding (UFLS) capability and mitigate risks, AEMO is updating and expanding existing network constraints to keep power flows across the Heywood interconnector within limits that allow South Australia's UFLS to operate effectively if needed.

The following constraint equation will be added to the South Australian system normal set at 1100 hrs Friday 9th October 2020.
V_S_HEYWOOD_ULFS

A fact sheet on the new constraint equation is available here: https://aemo.com.au/-/media/files/initiatives/der/2020/heywood-ufls-constraints-fact-sheet.pdf

Support Information:
For further details on this constraint equation please contact the AEMO Information and Support Hub supporthub@aemo.com.au or call 1300 236 600.

Ben Blake
AEMO Operations
77646CONSTRAINTS10/09/2020 11:29:33 AM

Update to system strength requirements in North Queensland

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 76608

Powerlink have revised the strength requirements in North Queensland. AEMO has updated the related constraint equations and these will be implemented at 1000 hrs Friday 11th September 2020.

The new and revised combinations are now published in a limits advice document on AEMO's website: https://www.aemo.com.au/energy-systems/electricity/national-electricity-market-nem/system-operations/congestion-information-resource/limits-advice

This advice contains all the combinations for Queensland for system normal cases and replaces all the previous advice.

The constraint equations in the Q-NIL set of the form below will be modified:
Q_NIL_STRGTH_XXX

For further details please contact James Lindley at james.lindley@aemo.com.au or Simon Taylor at businessdevelopment@powerlink.com.au

Ben Blake
AEMO Operations
77600CONSTRAINTS09/09/2020 11:37:10 AM

Update to Vic to NSW voltage collapse limit

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 63893

AEMO is currently revising the existing voltage collapse constraint equation for Victoria to NSW transfers for the simultaneous loss of all APD potlines. The existing equation requires a review for record low Victorian demands and high transfers to NSW. To reduce the instances of AEMO invoking discretionary limits while this review is being completed an offset of 250 MW will be applied to the existing constraint equation.

This change will occur at 1400 hrs 9th September 2020.

The following constraint equation will be modified:
V^^N_NIL_1

For further details on this new constraint equation please contact ben.blake@aemo.com.au

Ben Blake
AEMO Operations
77189CONSTRAINTS27/08/2020 11:25:00 AM

New West Murray issue and new limit on Murraylink

AEMO ELECTRICITY MARKET NOTICE

The West Murray region continues to be a challenging area to manage power system security. New technical issues impacting grid performance and operational stability have been identified following review of the Ararat to Crowlands 220 kV line trip on 20 August 2020.

To manage power system security AEMO will be limiting the flow on the Murraylink interconnector from SA to Vic to 95 MW. This will be implemented from 1200 hrs on 26 August 2020 with the following IDs:

Constraint Set ID: I-SVML_095
Constraint Equation ID: SVML_095

The limit will remain in place until 16 October 2020 unless otherwise notified. AEMO will provide updates on this matter as issues are further explored and potential solutions identified.

Ben Blake
AEMO Operations
76608CONSTRAINTS11/08/2020 05:34:13 PM

Update to system strength requirements in North Queensland

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 76455

AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland. A revision to the constraint equations will be implemented at 1400 hrs Wednesday 12th August 2020.

Combination 8 (in market notice 74655) has been updated to allow for 1 unit on at Callide B or Callide C (instead of 1 unit on at both).

The combination will be updated to:
8 - 2 x Stanwell, 1 x Callide B or 1 x Callide C, 3 x Gladstone, 7 x Total Stanwell+Callide+Gladstone, 2 x Kareeya: 100% output at Clare, Collinsville, Daydream, Hamilton, Hayman, Kidston, Ross, Rugby Run, Whitsunday

The constraint equations in the Q-NIL set of the form below will be modified:
Q_NIL_STRGTH_XXX
Q_NIL_STRGTH_XXX_I

For further details please contact James Lindley at james.lindley@aemo.com.au or Simon Taylor at businessdevelopment@powerlink.com.au

Ben Blake
AEMO Operations
76526CONSTRAINTS03/08/2020 02:47:40 PM

Update to system strength requirements in North Queensland

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 76455

AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland. The constraint equations will be revised at 1400 hrs Wed 5th August 2020.

The following combination will be updated:
7 - 2 x Stanwell, 1 x Callide B or Callide C, 3 x Gladstone, 7 x Total Stanwell+Callide+Gladstone, 0 or 1 x Kareeya, > 450 MW Nth Qld load, > 250 MW Ross + FNQ load: 80% output at Clare, Collinsville, Daydream, Hamilton, Hayman, Kidston, Ross, Rugby Run, Whitsunday

The following new combinations will be implemented:
10 - 2 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 8 x Total Stanwell+Callide+Gladstone, 3 x Kareeya, > 450 MW Nth Qld load, > 250 MW Ross + FNQ load: 20% output at Haughton, Sun Metals and Mt Emerald WF
11 - 2 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 8 x Total Stanwell+Callide+Gladstone, 3 x Kareeya, 1 x Barron Gorge, > 450 MW Nth Qld load, > 250 MW Ross + FNQ load: 40% output at Haughton, Sun Metals and Mt Emerald WF

If combination 7 is not met Clare, Collinsville, Daydream, Hamilton, Hayman, Kidston, Ross, Rugby Run, Whitsunday are limited to 0 MW and 0 inverters.
If combinations 10 and 11 are not met Haughton, Sun Metals and Mt Emerald WF are limited to 0 MW and 0 inverters

The constraint equations in the Q-NIL set of the form below will be modified:
Q_NIL_STRGTH_XXX
Q_NIL_STRGTH_XXX_I

For further details please contact James Lindley at james.lindley@aemo.com.au or Simon Taylor at businessdevelopment@powerlink.com.au

Ben Blake
AEMO Operations
76455CONSTRAINTS27/07/2020 11:57:03 AM

Update to system strength requirements in North Queensland

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 76008

AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland. A revision to the requirements will be implemented at 1400 hrs today.

The following new combination will be implemented:
7 - 2 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 8 x Total Stanwell+Callide+Gladstone, 0 or 1 x Kareeya, > 450 MW Nth Qld load, > 250 MW Ross + FNQ load: 80% output at Clare, Collinsville, Daydream, Hamilton, Hayman, Kidston, Ross, Rugby Run, Whitsunday
8 - 2 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 7 x Total Stanwell+Callide+Gladstone, 2 x Kareeya: 100% output at Clare, Collinsville, Daydream, Hamilton, Hayman, Kidston, Ross, Rugby Run, Whitsunday
9 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 0 x Kareeya, > 450 MW Nth Qld load, > 250 MW Ross + FNQ load: 100% output at Clare, Collinsville, Daydream, Hamilton, Hayman, Kidston, Ross, Rugby Run, Whitsunday

For all the above combinations Haughton, Sun Metals and Mt Emerald WF are limited to 0 MW and 0 inverters.

If these combinations are not met Clare, Collinsville, Daydream, Hamilton, Hayman, Kidston, Ross, Rugby Run, Whitsunday generators have a limit of 0 MW and 0 inverters.

The constraint equations are:
Q_NIL_STRGTH_CLRSF, Q_NIL_STRGTH_CLRSF_I
Q_NIL_STRGTH_COLSF, Q_NIL_STRGTH_COLSF_I
Q_NIL_STRGTH_DAYSF, Q_NIL_STRGTH_DAYSF_I
Q_NIL_STRGTH_HAMSF, Q_NIL_STRGTH_HAMSF_I
Q_NIL_STRGTH_HAYSF, Q_NIL_STRGTH_HAYSF_I
Q_NIL_STRGTH_KIDSF, Q_NIL_STRGTH_KIDSF_I
Q_NIL_STRGTH_RGBSF, Q_NIL_STRGTH_RGBSF_I
Q_NIL_STRGTH_RRSF, Q_NIL_STRGTH_RRSF_I
Q_NIL_STRGTH_WHTSF, Q_NIL_STRGTH_WHTSF_I

For further details please contact James Lindley at james.lindley@aemo.com.au or Simon Taylor at businessdevelopment@powerlink.com.au

Ben Blake
AEMO Operations