66395RECLASSIFY CONTINGENCY15/01/2019 06:03:50 PM

Reclassification of a Non-Credible Contingency Event: Tungatinah - New Norfolk tee Meadowbank 1 110KV line and Tungatinah - New Norfolk tee Meadowbank 2 110KV line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: TAS1

Lines: Tungatinah - New Norfolk tee Meadowbank 1 110KV and Tungatinah - New Norfolk tee Meadowbank 2 110KV

Duration: 15/01/2019 18:03 until further notice

Constraint set(s) invoked:
T-TU_MB_NN_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE


Auto-generated on behalf of Manager NEM Real Time Operations
66394RECLASSIFY CONTINGENCY15/01/2019 06:03:50 PM

Reclassification of a Non-Credible Contingency Event: Chapel St - Liapootah No.1 220 kV line and Chapel St - Liapootah No.2 220 kV line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: TAS1

Lines: Chapel St - Liapootah No.1 220 kV and Chapel St - Liapootah No.2 220 kV

Duration: 15/01/2019 18:03 until further notice

Constraint set(s) invoked:
T-CSLI_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE


Auto-generated on behalf of Manager NEM Real Time Operations
66393RECLASSIFY CONTINGENCY15/01/2019 03:43:40 PM

Reclassification of a Non-Credible Contingency Event: Bulli Creek - Dumaresq 8L 330KV line and Bulli Creek - Dumaresq 8M 330KV line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: QLD1

Lines: Bulli Creek - Dumaresq 8L 330KV and Bulli Creek - Dumaresq 8M 330KV

Duration: 15/01/2019 15:43 until further notice

Constraint set(s) invoked:
I-QNI_ONE_PHASE_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NSW1-QLD1


Auto-generated on behalf of Manager NEM Real Time Operations
66392RESERVE NOTICE15/01/2019 02:47:55 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the Vic Region on 15/01/2019

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the Vic region advised in AEMO Electricity Market Notice No.66390 is cancelled at 1445 hrs 15/01/2019.

Manager NEM Real Time Operations
66391RESERVE NOTICE15/01/2019 03:31:52 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the New South Wales Region on 18/01/2019

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:

From 1530 hrs to 1600 hrs 18/01/2019.
The forecast capacity reserve requirement is 1320 MW.
The minimum capacity reserve available is 1258 MW.

Danushka Sooriyadasa
AEMO Operations
66390RESERVE NOTICE15/01/2019 01:14:36 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the Vic Region on 15/01/2019

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the Vic region for the following period:

From 1600 hrs to 1700 hrs 15/01/2019.
The forecast capacity reserve requirement is 1090 MW.
The minimum capacity reserve available is 1032 MW.

Manager NEM Real Time Operations
66389RECLASSIFY CONTINGENCY15/01/2019 12:24:45 PM

Cancellation of a Non-Credible Contingency Event: Norwood - Scottsdale - Derby line and Norwood - Scottsdale line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: TAS1

Lines: Norwood - Scottsdale - Derby and Norwood - Scottsdale

Cancellation time: 15/01/2019 12:24

Constraint set(s) revoked:
NONE

Refer AEMO Electricity Market Notice 66384

Auto-generated on behalf of Manager NEM Real Time Operations
66388RECLASSIFY CONTINGENCY15/01/2019 12:13:15 PM

Cancellation of a Non-Credible Contingency Event: Farrell-Sheffield No.1 220 kV line and Farrell-Sheffield No.2 220 kV line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: TAS1

Lines: Farrell-Sheffield No.1 220 kV and Farrell-Sheffield No.2 220 kV

Cancellation time: 15/01/2019 12:13

Constraint set(s) revoked:
F-T-FASH_N-2 Constraint set contains the following interconnector(s) on the left hand side:
T-V-MNSP1
T-FASH_N-2_CP4_S1 Constraint set contains the following interconnector(s) on the left hand side:
NONE


Refer AEMO Electricity Market Notice 66379

Auto-generated on behalf of Manager NEM Real Time Operations
66387RECLASSIFY CONTINGENCY15/01/2019 12:13:15 PM

Cancellation of a Non-Credible Contingency Event: Farrell - Reece No.1 220 kV line and Farrell - Reece No.2 220 kV line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: TAS1

Lines: Farrell - Reece No.1 220 kV and Farrell - Reece No.2 220 kV

Cancellation time: 15/01/2019 12:13

Constraint set(s) revoked:
F-T-FARE_N-2 Constraint set contains the following interconnector(s) on the left hand side:
T-V-MNSP1


Refer AEMO Electricity Market Notice 66380

Auto-generated on behalf of Manager NEM Real Time Operations