End of RERT Dispatch - null and End of intervention event
Cancellation: Direction - NSW region 24/01/2019
Cancellation: Direction - NSW region 24/01/2019
Refer to Market Notice 66634
Direction is cancelled from 2115 hrs 24/01/2019
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the Victoria region - 24/01/2019
Cancellation of Actual (LOR1) condition in the Victoria region - 24/01/2019
The Actual LOR2 Condition in the Victoria region advised in AEMO Electricity Market Notice No.66621 is cancelled at 2150 hrs 24/01/2019
Manager NEM Real Time Operations
Cancellation of Actual (LOR2) condition in the Victoria region - 24/01/2019
Cancellation of Actual (LOR2) condition in the Victoria region - 24/01/2019
The Actual LOR2 Condition in the Victoria region advised in AEMO Electricity Market Notice No.66630 is cancelled at 2150 hrs 24/01/2019
Manager NEM Real Time Operations
Cancellation of Actual (LOR2) condition in the South Australia region - 24/01/2019
Cancellation of Actual (LOR2) condition in the South Australia region - 24/01/2019
The Actual LOR2 Condition in the South Australia region advised in AEMO Electricity Market Notice No.66666 is cancelled at 2150 hrs 24/01/2019
Manager NEM Real Time Operations
PDPASA - Suspect Lack of Reserve Level 1 - Tasmania Region - 25/01/2019
AEMO considers that there is a suspect Forecast LOR1 condition being reported for the Tasmania region for the following period:
From 1200 hrs on 25/01/2019 to 1500 hrs on 25/01/2019
AEMO considers this forecast LOR1 condition invalid.
No LOR condition is currently forecast for the Tasmania region.
Manager NEM Real Time Operations
[EventId:201901242115_NRM_VIC1_NSW1_stopped] NEGRES CONSTRAINT NRM_VIC1_NSW1 ceased operating from 24 January 2019 21:15
Issued by Australian Energy Market Operator Ltd at 2115 hrs on 24 January 2019
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to NSW - 24 January 2019.
Refer to market notice: 66713
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to NSW directional interconnector.
The negative residue constraint NRM_VIC1_NSW1 ceased operating at 2115 hrs on 24 January 2019.
This is an AEMO autogenerated Market Notice.
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the Vic Region on 25/01/2019
The Forecast LOR1 condition in the Vic region advised in AEMO Electricity Market Notice No. 66615 has been updated at 2110 hrs to the following:
1) From 0930 hrs 25/01/2019 to 1030 hrs 25/01/01/2019
The contingency forecast capacity reserve requirementd is 1120 MW.
The minimum capacity reserve available is 849 MW.
2) From 1530 hrs 25/01/2019 to 1630 hrs 25/01/01/2019
The contingency forecast capacity reserve requirementd is 1120 MW.
The minimum capacity reserve available is 665 MW.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the Vic Region on 25/01/2019
The Forecast LOR2 condition in the Vic region advised in AEMO Electricity Market Notice No. 66614 has been updated at 2120 hrs to the following:
1) From 1030 hrs 25/01/2019 to 1200 hrs 25/01/2019.
The forecast capacity reserve requirement is 623 MW.
The minimum capacity reserve available is 162 MW.
2) From 1500 hrs 25/01/2019 to 1530 hrs 25/01/2019.
The forecast capacity reserve requirement is 668 MW.
The minimum capacity reserve available is 380 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.