54865RESERVE NOTICE12/09/2016 09:24:16 AM

Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region - 13, 14 and 16 Sep 2016

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Market Notices: 54734, 54735 and 54864.

Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region for the following periods:

On 13/09/2016 from 0700 hrs to 1700 hrs;
On 14/09/2016 from 0700 hrs to 1700 hrs; and
On 16/09/2016 from 0700 hrs to 1700 hrs.

AEMO declares Forecast LOR2 conditions in the South Australia region for the above periods. During these periods, outages are scheduled for Moorabool to Mortlake No.2 500 kV transmission line in Victoria region.

On the occurrence of a credible contingency during these outages, South Australia region could separate from the rest of the NEM and is likely to result in interruptions to power supplies in South Australia.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but following the next credible contingency it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing interruptions to power supplies in South Australia.

Harmohan Singh
Operations Planning
54864GENERAL NOTICE08/09/2016 12:41:18 PM

Planned outage of Moorabool to Mortlake PS 500kV line in Victoria region from 16/09/2016 0700 hrs to 16/09/2016 1700 hrs

AEMO ELECTRICITY MARKET NOTICE.

**Re-scheduled outage from Ausnet. **
Orginally planned for 15/09/2016 0700 hrs to 15/09/2016 1700 hrs and now been rescheduled as below.

This market notice is FOR INFORMATION ONLY.

The Moorabool to Mortlake PS 500kV line in Victoria Region is planned out of service from 0700 hrs on 16 September 2016 to 1700 hrs on 16 September 2016.

During this outage, a credible contingency can separate South Australia region from the rest of the NEM.

Under these circumstances, 35 MW of Raise and Lower regulation FCAS will be sourced from South Australia for the duration of this outage. In addition, consistent with AEMO existing procedures, adequate contingency FCAS lower requirements will also be sourced from South Australia at times when power transfer is from South Australia to Victoria.

The following constraint sets have been invoked for this outage:

F-V-MLMO (includes F-S_LREG_0035 and F-S_RREG_0035)
S-X_BC_CP
V-MLMO

Refer AEMO Network Outage Schedule (NOS) for further details.

AEMO will continue monitoring this proposed outage and will update the Market accordingly.

Edmund Hon
AEMO Operations
54863ADMINISTERED PRICE CAP08/09/2016 03:55:30 AM

[EventId:92] AP STARTED for market ancillary services in SA at 08 September 2016 04:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0355 hrs on 8 September 2016

ADMINISTERED PRICE PERIOD DECLARED in SA region.

AEMO has determined that the rolling sum of the uncapped market ancillary Lower Reg, Raise Reg services(s) prices for the SA region over the previous 2016 dispatch intervals has exceeded 6 times the cumulative price threshold (CPT) of $210,100.00.

In accordance with Clause 3.14 of the National Electricity Rules, AEMO has determined that an administered price period will commence at the dispatch interval starting 0400 hrs on 8 Sep 2016 and will continue through to the end of that trading day.

An administered price cap (APC) of 300 $/MWh will apply to all dispatch intervals during this administered price period. This APC will apply to all market ancillary service prices in the SA region.

An administered floor price (AFP) of 0 $/MWh AFP will apply to all market ancillary service prices.

AEMO will continue to monitor the rolling sum of the uncapped market ancillary service prices and issue further market notices as required.


This is an AEMO autogenerated Market Notice.
54862ADMINISTERED PRICE CAP08/09/2016 03:55:09 AM

[EventId:91] AP ENDED for market ancillary services in SA at 08 September 2016 04:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0355 hrs on 8 September 2016

ADMINISTERED PRICE PERIOD ENDS in SA region.

In accordance with Clause 3.14.2(b) of the National Electricity Rules, AEMO is notifying market particpants that the administered price period declared for the SA region in market notice 54857 will end at 0400 hrs on 8 September 2016.


This is an AEMO autogenerated Market Notice.
54861RESERVE NOTICE08/09/2016 02:26:33 AM

Actual LOR2 South Australia Region - 08 Sept 2016

AEMO ELECTRICITY MARKET NOTICE

Actual LOR2 South Australia Region - 08 Sept 2016

Refer AEMO Electricity Market Notice 54686

An Actual LOR2 condition is declared for the South Australia region from 0220 hrs until further notice due to the planned outage of the Heywood No.2 500 kV busbar.

If a credible contingency event occurs during this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.


Manager NEM Real Time Operations
54860RESERVE NOTICE07/09/2016 11:05:38 PM

Cancellation of the Actual (LOR2) condition in the South Australia region 07 Sept 2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation of the Actual (LOR2) condition in the South Australia region 07 Sept 2016

Refer to AEMO Electricity Market Notice No. 54853

The Actual LOR2 condition in the South Australia Region is cancelled at 2300 hrs 07 September 2016


Manager NEM Real Time Operations

54859GENERAL NOTICE07/09/2016 04:00:31 PM

Planned DAILY outage of Heywood to Tarrone PS 500kV line in Victoria region from 05/10/2016 0630 hrs to 07/09/2016 1530 hrs

AEMO ELECTRICITY MARKET NOTICE.

This market notice is FOR INFORMATION ONLY.

The Heywood to Tarrone PS 500kV line in Victoria Region is planned out of service DAILY from 0630 hrs on 05 October 2016 to 1530 hrs on 07 October 2016.

During this outage, a credible contingency can separate South Australia region from the rest of the NEM.

Under these circumstances, 35 MW of Raise and Lower regulation FCAS will be sourced from South Australia for the duration of this outage. In addition, consistent with AEMO existing procedures, adequate contingency FCAS lower requirements will also be sourced from South Australia at times when power transfer is from South Australia to Victoria.

The following constraint sets have been invoked for this outage:

F-V-HYTR (includes F-S_LREG_0035 and F-S_RREG_0035)
S-X_BC_CP
V-HYTR

Refer AEMO Network Outage Schedule (NOS) for further details.

AEMO will continue monitoring this proposed outage and will update the Market accordingly.


Edmund Hon
AEMO Operations
54858INTER-REGIONAL TRANSFER07/09/2016 03:41:53 PM

Inter-Regional Transfer Limit Variation - Directlink - NSW Region 7 September 2016

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer Limit Variation - Directlink - NSW Region - 7 September 2016

The outage of the DC3 pole of Directlink was scheduled to complete at 1700 hrs 9/09/16.

The outage has completed early.

The following constraint set for this outage was revoked at 1510 hrs.
N-X_MBTE_2

The constraint set contains the following interconnector on the left hand side:
N-Q-MNSP1

See AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
54857ADMINISTERED PRICE CAP07/09/2016 03:55:23 AM

[EventId:91] AP STARTED for market ancillary services in SA at 07 September 2016 04:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0355 hrs on 7 September 2016

ADMINISTERED PRICE PERIOD DECLARED in SA region.

AEMO has determined that the rolling sum of the uncapped market ancillary Lower Reg, Raise Reg services(s) prices for the SA region over the previous 2016 dispatch intervals has exceeded 6 times the cumulative price threshold (CPT) of $210,100.00.

In accordance with Clause 3.14 of the National Electricity Rules, AEMO has determined that an administered price period will commence at the dispatch interval starting 0400 hrs on 7 Sep 2016 and will continue through to the end of that trading day.

An administered price cap (APC) of 300 $/MWh will apply to all dispatch intervals during this administered price period. This APC will apply to all market ancillary service prices in the SA region.

An administered floor price (AFP) of 0 $/MWh AFP will apply to all market ancillary service prices.

AEMO will continue to monitor the rolling sum of the uncapped market ancillary service prices and issue further market notices as required.


This is an AEMO autogenerated Market Notice.
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm