Work package 5: Market and system operations

Overview

Generally, only minor changes are required to the market and system operation procedures, methodologies and guidelines that are affected by the Wholesale Demand Response Mechanism rule. These documents are listed in the table below. 

Note that the following documents will be updated without a rules consultation because the necessary WDR changes are considered minor or administrative in nature. 

  • Spot Market Operations Timetable
  • Power System Security Guidelines (SO_OP_3715)

Key dates

Issues paper published 9 October 2020
 Submissions due on Issues Paper 17 November 2020
Draft Report published 11 December 2020
 Submissions due on Draft Report 29 January 2021
Final Report published 12 March 2021

Status

Preparing draft report.