[EventId:202108181615_review] Prices for interval 18-Aug-2021 16:15 are subject to review
Issued by Australian Energy Market Operator Ltd at 1610 hrs on 18 August 2021
PRICES ARE SUBJECT TO REVIEW for dispatch interval 18-Aug-2021 16:15.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202108181610_review] Prices for interval 18-Aug-2021 16:10 are subject to review
Issued by Australian Energy Market Operator Ltd at 1605 hrs on 18 August 2021
PRICES ARE SUBJECT TO REVIEW for dispatch interval 18-Aug-2021 16:10.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202108181605_review] Prices for interval 18-Aug-2021 16:05 are subject to review
Issued by Australian Energy Market Operator Ltd at 1600 hrs on 18 August 2021
PRICES ARE SUBJECT TO REVIEW for dispatch interval 18-Aug-2021 16:05.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
Possible intervention to manage power system security in South Australia (SA) Region
Possible intervention to manage power system security in South Australia (SA) Region
The synchronous generating units currently expected to be synchronised in SA from 2230 hrs 19/08/2021 to 0400 hrs 21/08/2021 will be inadequate to maintain sufficient system strength in SA and hence a secure operating state.
AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operation
Inter-Regional Transfer limit variation - Directlink - NSW Region
Inter-Regional Transfer limit variation - Directlink - NSW Region
There has been an unplanned outage of the No 2 Leg of Directlink
The following constraint set was invoked at 1535 hrs 18/08/2021.
N-X_MBTE_2
The constraint set contains the following interconnector on the left hand side.
N-Q-MNSP1
Refer AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 25/08/2021
AEMO declares a forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:
From 1800 hrs 25/08/2021 to 2130 hrs 25/08/2021.
The forecast capacity reserve requirement is 250 MW.
The minimum capacity reserve available is 66 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 25/08/2021
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:
[1.] From 0900 hrs 25/08/2021 to 1030 hrs 25/08/2021.
The forecast capacity reserve requirement is 450 MW.
The minimum capacity reserve available is 271 MW.
[2.] From 1700 hrs 25/08/2021 to 1800 hrs 25/08/2021.
The forecast capacity reserve requirement is 450 MW.
The minimum capacity reserve available is 258 MW.
[3.] From 2130 hrs 25/08/2021 to 0100 hrs 26/08/2021.
The forecast capacity reserve requirement is 470 MW.
The minimum capacity reserve available is 268 MW.
AEMO Operations
Direction - SA Region 18/08/2021
Direction - SA Region 18/08/2021
In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).
The direction was necessary to maintain the power system in a secure operating state.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.
The issue of the direction commences an AEMO intervention event. AEMO declares all dispatch intervals during the event to be intervention dispatch intervals, commencing from the interval ending 1805 hrs on 18/08/2021.
Intervention pricing does not apply to this AEMO intervention event.
Manager NEM Real Time Operations
Possible intervention to manage power system security in South Australia (SA) Region
Possible intervention to manage power system security in South Australia (SA) Region
The synchronous generating units currently expected to be synchronised in SA from 1000 hrs 19/08/2021 to 1530 hrs 19/08/2021 will be inadequate to maintain sufficient system strength in SA and hence a secure operating state.
AEMO estimates that, in the absence of sufficient market response by 1800 hrs 18/08/2021, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operation