[EventId:202106241025_review] Prices for interval 24-Jun-2021 10:25 are subject to review
Issued by Australian Energy Market Operator Ltd at 1020 hrs on 24 June 2021
PRICES ARE SUBJECT TO REVIEW for dispatch interval 24-Jun-2021 10:25.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202106241020_review] Prices for interval 24-Jun-2021 10:20 are subject to review
Issued by Australian Energy Market Operator Ltd at 1015 hrs on 24 June 2021
PRICES ARE SUBJECT TO REVIEW for dispatch interval 24-Jun-2021 10:20.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202106241015_review] Prices for interval 24-Jun-2021 10:15 are subject to review
Issued by Australian Energy Market Operator Ltd at 1010 hrs on 24 June 2021
PRICES ARE SUBJECT TO REVIEW for dispatch interval 24-Jun-2021 10:15.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202106241010_review] Prices for interval 24-Jun-2021 10:10 are subject to review
Issued by Australian Energy Market Operator Ltd at 1005 hrs on 24 June 2021
PRICES ARE SUBJECT TO REVIEW for dispatch interval 24-Jun-2021 10:10.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202106241005_review] Prices for interval 24-Jun-2021 10:05 are subject to review
Issued by Australian Energy Market Operator Ltd at 1000 hrs on 24 June 2021
PRICES ARE SUBJECT TO REVIEW for dispatch interval 24-Jun-2021 10:05.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
Outage Cancelled: Panned outage of Heywood-Mortlake PS 500kV line in Victoria region on 25th June 2021
Refer to AEMO Electricity Market Notices 86491.
The Heywood-Mortlake PS 500kV line in the Victoria (VIC) region was planned to be out of service on 25/06/2021. This outage is now cancelled.
All constraint sets associated with this outage have been revoked.
AEMO Operations
Cancellation of a Non-Credible Contingency Event: Farrell - Reece No.1 220 kV line and Farrell - Reece No.2 220 kV line in TAS1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: TAS1
Lines: Farrell - Reece No.1 220 kV and Farrell - Reece No.2 220 kV
Cancellation time: 24/06/2021 04:44
Constraint set(s) revoked:
F-T-FARE_N-2 Constraint set contains the following interconnector(s) on the left hand side:
T-V-MNSP1
Refer AEMO Electricity Market Notice 87631
Auto-generated on behalf of Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Farrell - Reece No.1 220 kV line and Farrell - Reece No.2 220 kV line in TAS1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: TAS1
Lines: Farrell - Reece No.1 220 kV and Farrell - Reece No.2 220 kV
Duration: 24/06/2021 03:40 until further notice
Constraint set(s) invoked:
F-T-FARE_N-2 Constraint set contains the following interconnector(s) on the left hand side:
T-V-MNSP1
Auto-generated on behalf of Manager NEM Real Time Operations
Non-credible contingency event more likely to occur due to existence of abnormal conditions - SA region
AEMO has identified that a non-credible contingency event is more likely to occur because of the existence of abnormal conditions namely severe weather in the SA region.
As at the time of this notice the criteria for reclassification of any non-credible contingency event have not been met, however there is a possibility of severe weather impacting multiple transmission elements in its vicinity.
Conditions can change rapidly and potentially impacted plant may change. Further notices will only be published to advise of any reclassification, or when the abnormal conditions have ceased to impact the likelihood of a non-credible event occurring.
Constraint set I-VS_250 invoked at 0005 hrs 24/06/2021 until further notice.
Manager NEM Real Time Operations