Market Notices

54158RESERVE NOTICE28/06/2016 03:13

RESERVE NOTICE MT PASA PUBLICATION 28 JUNE 2016

AEMO ELECTRICITY MARKET NOTICE

The MT PASA RELIABILITY_LRC results published on 28 June 2016 forecast shows low reserve conditions (LRC) in South Australia for Summer 2016-17 and Summer 2017-18. AEMO will continue to monitor the situation and take appropriate actions, if necessary.

The MT PASA results for the next 12 months are summarised at:
http://www.aemo.com.au/Electricity/Data/Forecast-Supply-and-Demand/Medium-Term-Outlook

This notice supersedes Market Notice 54002 published on 21 June 2016.

Please find the following information on some key inputs used in MT PASA:

Static minimum reserve levels (MRLs) have been specified for QLD, NSW and TAS regions as follows:

QLD: 913 MW
NSW: -1564 MW
TAS: 144 MW

The following optimum shared minimum reserve levels between Victoria and South Australia regions have been specified:

VIC Reserve >= 205.00
5.88 * VIC Reserve + SA Reserve >= 1237.88
1.33 * VIC Reserve + SA Reserve >= 228.00
0.43 * VIC Reserve + SA Reserve >= -40.53
0.23 * VIC Reserve + SA Reserve >= -147.55
SA Reserve >= -368.00

In order to remain consistent with the calculation of the minimum reserve levels, the following interconnector headroom constraints (net import/export limit constraints) have also been applied in MT PASA:

QLD: 0 MW of maximum net import into QLD.
NSW: 330 MW of minimum net export from NSW.
VIC: 940MW of maximum net import into VIC.
SA: 0 MW of maximum net import into SA.

Demand Side Participation included in MT PASA are:

Summer: QLD 156 MW, NSW 422 MW, VIC 245 MW, SA 167 MW and TAS 73 MW

Winter: QLD 156 MW, NSW 422 MW, VIC 185 MW, SA 167 MW and TAS 73 MW

Supply Planning
AEMO
54157RESERVE NOTICE28/06/2016 11:01

Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - STPASA - 04/07/2016

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition for the South Australia region for the following period:

From 04/07/2016 1800 hrs to 1900 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 165 MW

AEMO is seeking a market response.

AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.

Operations Planning
54156PRICES UNCHANGED27/06/2016 11:10

[EventId:201606272315_confirmed] Prices for interval 27-Jun-2016 23:15 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2310 hrs on 27 June 2016

PRICES ARE NOW CONFIRMED for dispatch interval 27-Jun-2016 23:15.

In accordance with Market Notice 54154 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
54155PRICES UNCHANGED27/06/2016 11:11

[EventId:201606272310_confirmed] Prices for interval 27-Jun-2016 23:10 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2310 hrs on 27 June 2016

PRICES ARE NOW CONFIRMED for dispatch interval 27-Jun-2016 23:10.

In accordance with Market Notice 54153 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
54154PRICES SUBJECT TO REVIEW27/06/2016 11:10

[EventId:201606272315_review] Prices for interval 27-Jun-2016 23:15 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2310 hrs on 27 June 2016

PRICES ARE SUBJECT TO REVIEW for dispatch interval 27-Jun-2016 23:15.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2(b) of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
54153PRICES SUBJECT TO REVIEW27/06/2016 11:05

[EventId:201606272310_review] Prices for interval 27-Jun-2016 23:10 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2305 hrs on 27 June 2016

PRICES ARE SUBJECT TO REVIEW for dispatch interval 27-Jun-2016 23:10.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2(b) of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
54152GENERAL NOTICE27/06/2016 05:32

Update - Raise Regulation FCAS Increased - 27/06/16

AEMO ELECTRICITY MARKET NOTICE

Update - Variation to FCAS regulation requirements: NEM Global - 27/06/16.

Refer to MN 54151

FCAS Raise regulation requirements were increased to manage time error to within standards.

The following constraints were invoked to manage raise regulation requirements.

F-MAIN_RREG_0350 invoked from 1650 hrs to 1735 hrs

Manager NEM Real Time Operations
54151GENERAL NOTICE27/06/2016 04:55

Raise Regulation FCAS Increased - 27/06/16

AEMO ELECTRICITY MARKET NOTICE

Variation to FCAS regulation requirements: NEM Global - 27/06/16.

FCAS Raise regulation requirements have been increased to manage time error to within standards.

The following constraints have been invoked to manage raise regulation requirements.

F-MAIN_RREG_0350 invoked from 1650 hrs until further notice.

Manager NEM Real Time Operations
54150NON-CONFORMANCE27/06/2016 02:25

NON-CONFORMANCE Region QLD1 Monday, 27 June 2016

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Monday, 27 June 2016

AEMO declared a schedule generating unit non-conforming

Unit: BRAEMAR1
Duration: 27/06/2016 14:20 to 27/06/2016 14:25
Amount: -110 MW
Constraint: NC-Q_BRAEMAR1

Auto-generated on behalf of Manager NEM Real Time Operations