PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the Qld Region on 24/10/2021
The Forecast LOR1 condition in the Qld region advised in AEMO Electricity Market Notice No.91901 is cancelled at 1718 hrs 23/10/2021
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Collinsville North - Proserpine No.7125 132 kV line and Collinsville North - Proserpine No.7126 132 kV line in QLD1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: QLD1
Lines: Collinsville North - Proserpine No.7125 132 kV and Collinsville North - Proserpine No.7126 132 kV
Duration: 23/10/2021 16:06 until further notice
Constraint set(s) invoked:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Collinsville Nth-Clare Sth Tee King Creek 7128 132kV line and Strathmore-Clare South 7208 132kV line in QLD1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: QLD1
Lines: Collinsville Nth-Clare Sth Tee King Creek 7128 132kV and Strathmore-Clare South 7208 132kV
Duration: 23/10/2021 16:06 until further notice
Constraint set(s) invoked:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Tarong - Chinchilla No.7168 132 kV line and Tarong - Chinchilla No.7183 132 kV line in QLD1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: QLD1
Lines: Tarong - Chinchilla No.7168 132 kV and Tarong - Chinchilla No.7183 132 kV
Duration: 23/10/2021 15:57 until further notice
Constraint set(s) invoked:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Bayswater - Mt Piper No.5A3 500kV line and Wollar - Mt Piper No.5A5 500kV line in NSW1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: NSW1
Lines: Bayswater - Mt Piper No.5A3 500kV and Wollar - Mt Piper No.5A5 500kV
Duration: 23/10/2021 15:32 until further notice
Constraint set(s) invoked:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
STPASA - Update Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region beginning on 27/10/2021
Refer AEMO Market Notice 91891
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:
[1.] From 1800 hrs 27/10/2021 to 1900 hrs 27/10/2021.
The forecast capacity reserve requirement is 176 MW.
The minimum capacity reserve available is 136 MW.
[2.] From 0530 hrs 28/10/2021 to 0730 hrs 28/10/2021.
The forecast capacity reserve requirement is 183 MW.
The minimum capacity reserve available is 89 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region beginning on 27/10/2021
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:
[1.] From 1700 hrs 27/10/2021 to 1800 hrs 27/10/2021.
The forecast capacity reserve requirement is 351 MW.
The minimum capacity reserve available is 239 MW.
[2.] From 0300 hrs 28/10/2021 to 0330 hrs 28/10/2021.
The forecast capacity reserve requirement is 340 MW.
The minimum capacity reserve available is 332 MW.
[3.] From 0400 hrs 28/10/2021 to 0530 hrs 28/10/2021.
The forecast capacity reserve requirement is 358 MW.
The minimum capacity reserve available is 262 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 24/10/2021
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
[1.] From 1730 hrs 24/10/2021 to 1900 hrs 24/10/2021.
The forecast capacity reserve requirement is 978 MW.
The minimum capacity reserve available is 905 MW.
Manager NEM Real Time Operations
[EventId:202110231120_confirmed] Prices for interval 23-Oct-2021 11:20 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1140 hrs on 23 October 2021
PRICES ARE NOW CONFIRMED for trading interval 23-Oct-2021 11:20.
In accordance with Market Notice 91889 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.