STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region beginning on 27/10/2021.
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 91937 is cancelled at 1300 hrs 25/10/2021.
No LOR2 condition is currently forecast in the STPASA period.
AEMO Operations
STPASA - Update Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region beginning on 27/10/2021
The Forecast LOR2 conditions in the SA region advised in AEMO Electricity Market Notice No. 91936 has been updated at 1000 hrs 25/10/2021 to the following:
From 0600 hrs 28/10/2021 to 0700 hrs 28/10/2021.
The forecast capacity reserve requirement is 451 MW.
The minimum capacity reserve available is 449 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
The Forecast LOR2 condition on 27/10/2021 advised in AEMO Electricity Market Notice No. 91936 is cancelled at 1000 hrs 25/10/202.
AEMO Operations
STPASA - Update Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region beginning on 27/10/2021
The Forecast LOR2 conditions in the SA region advised in AEMO Electricity Market Notice No. 91935 has been updated at 0900 hrs 25/10/2021 to the following:
[1.] From 1800 hrs 27/10/2021 to 1900 hrs 27/10/2021.
The forecast capacity reserve requirement is 417 MW.
The minimum capacity reserve available is 239 MW.
[2.] From 0430 hrs 28/10/2021 to 0730 hrs 28/10/2021.
The forecast capacity reserve requirement is 425 MW.
The minimum capacity reserve available is 235 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Update Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region beginning on 27/10/2021
The Forecast LOR2 conditions in the SA region advised in AEMO Electricity Market Notice No. 91934 has been updated at 0700 hrs 25/10/2021 to the following:
[1.] From 1800 hrs 27/10/2021 to 1900 hrs 27/10/2021.
The forecast capacity reserve requirement is 459 MW.
The minimum capacity reserve available is 246 MW.
[2.] From 0530 hrs 28/10/2021 to 0700 hrs 28/10/2021.
The forecast capacity reserve requirement is 373 MW.
The minimum capacity reserve available is 233 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Update Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region beginning on 27/10/2021
Refer AEMO Market Notice 91932
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:
[1.] From 1730 hrs 27/10/2021 to 1900 hrs 27/10/2021.
The forecast capacity reserve requirement is 485 MW.
The minimum capacity reserve available is 262 MW.
[2.] From 0530 hrs 28/10/2021 to 0600 hrs 28/10/2021.
The forecast capacity reserve requirement is 373 MW.
The minimum capacity reserve available is 284 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Sydenham 500kV centre CB Moorabool 2 line South Morang 2 line- Vic region - 20/10/2020
Inter-regional transfer limit variation - Sydenham 500kV centre CB Moorabool 2 line South Morang 2 line- Vic region - 20/10/2020
At 2156 hrs there was a short notice outage at Sydenham on 500kV centre CB Moorabool 2 line /South Morang 2 line.
The following constraint set(s) was invoked from 2205 hrs until further notice
V-SY_CB
This constraint set(s) contains equations with the following interconnectors on the LHS.
T-V-MNSP1
V-SA
V-S-MNSP1
VIC1- NSW1
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 27/10/2021
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:
[1.] From 1830 hrs 27/10/2021 to 1900 hrs 27/10/2021.
The forecast capacity reserve requirement is 399 MW.
The minimum capacity reserve available is 360 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 28/10/2021
Refer AEMO Market Notice 91906
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:
[1.] From 0500 hrs 28/10/2021 to 0730 hrs 28/10/2021.
The forecast capacity reserve requirement is 358 MW.
The minimum capacity reserve available is 186 MW.
Manager NEM Real Time Operations
STPASA - STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 28/10/2021.
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 91923 is cancelled at 1500 hrs 24/10/2021.
No LOR2 condition is currently forecast in the STPASA period.
AEMO Operations