[EventId:202106211720_review] Prices for interval 21-Jun-2021 17:20 are subject to review
Issued by Australian Energy Market Operator Ltd at 1715 hrs on 21 June 2021
PRICES ARE SUBJECT TO REVIEW for dispatch interval 21-Jun-2021 17:20.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202106211715_review] Prices for interval 21-Jun-2021 17:15 are subject to review
Issued by Australian Energy Market Operator Ltd at 1710 hrs on 21 June 2021
PRICES ARE SUBJECT TO REVIEW for dispatch interval 21-Jun-2021 17:15.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
NON-CONFORMANCE Region NSW1 Monday, 21 June 2021
NON-CONFORMANCE NSW1 Region Monday, 21 June 2021
AEMO declared a schedule generating unit non-conforming
Unit: LD01
Duration: 21/06/2021 16:20 to 21/06/2021 16:35
Amount: 29 MW
Constraint: NC-N_LD01
Auto-generated on behalf of Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 21/06/2021
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 1730 hrs 21/06/2021 to 1800 hrs 21/06/2021.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1400 MW.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 23/06/2021
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 87530 is cancelled at 1200 hrs 21/06/2021.
No LOR condition is currently forecast in the STPASA period.
AEMO Operations
Planned outage of Heywood - South East no 1 line in the South Australia (SA) region from 20/07/2021 to 22/07/2021
The Heywood - South East no 1 line in the South Australia (SA) region is planned to be out of service from 0815 hrs on 20/07/2021 to 1730 hrs on 22/07/2021.
A credible contingency event during this planned outage could cause synchronous separation of the South Australia (SA) region from the rest of the NEM. If separation occurs, load may be interrupted due to the operation of the Automatic Under Frequency Load Shedding (AUFLS) scheme in SA.
The credible separation contingency is managed as follows:
-When power transfer is from SA to Victoria, contingency lower FCAS will be sourced from SA.
-When power transfer is from Victoria to SA, due to the 47-52Hz island separation frequency band advised by the SA jurisdiction, contingency raise FCAS is not sourced in SA and the AUFLS scheme may respond to low frequency events.
-Power transfer will be restricted on Victoria - South Australia interconnector (Heywood interconnector) to manage system security following the loss of the next contingency.
[Forecast capacity reserves in the SA region are currently sufficient to meet electricity demand during the planned outage.]
The following constraint sets have been invoked for this outage:
F-I-HYSE
I-HYSE
I-VS_050
S-HYSE_BC-2CP
S-X_BC_CP
V-HYTX_M12
Refer AEMO Network Outage Schedule (NOS) for further details.
Steve Oag
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 23/06/2021
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 0730 hrs 23/06/2021 to 0800 hrs 23/06/2021.
The forecast capacity reserve requirement is 1606 MW.
The minimum capacity reserve available is 1522 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
[EventId:202106210745_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 21 June 2021 07:45
Issued by Australian Energy Market Operator Ltd at 0745 hrs on 21 June 2021
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 21 June 2021.
Refer to market notice: 87528
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.
The negative residue constraint NRM_QLD1_NSW1 ceased operating at 0745 hrs on 21 June 2021.
This is an AEMO autogenerated Market Notice.
[EventId:202106210705_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 21 June 2021 07:05
Issued by Australian Energy Market Operator Ltd at 0705 hrs on 21 June 2021
ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 21 June 2021.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.
The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 0705 hrs on 21 June 2021.
This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.