54861RESERVE NOTICE08/09/2016 02:26:33 AM

Actual LOR2 South Australia Region - 08 Sept 2016

AEMO ELECTRICITY MARKET NOTICE

Actual LOR2 South Australia Region - 08 Sept 2016

Refer AEMO Electricity Market Notice 54686

An Actual LOR2 condition is declared for the South Australia region from 0220 hrs until further notice due to the planned outage of the Heywood No.2 500 kV busbar.

If a credible contingency event occurs during this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.


Manager NEM Real Time Operations
54860RESERVE NOTICE07/09/2016 11:05:38 PM

Cancellation of the Actual (LOR2) condition in the South Australia region 07 Sept 2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation of the Actual (LOR2) condition in the South Australia region 07 Sept 2016

Refer to AEMO Electricity Market Notice No. 54853

The Actual LOR2 condition in the South Australia Region is cancelled at 2300 hrs 07 September 2016


Manager NEM Real Time Operations

54859GENERAL NOTICE07/09/2016 04:00:31 PM

Planned DAILY outage of Heywood to Tarrone PS 500kV line in Victoria region from 05/10/2016 0630 hrs to 07/09/2016 1530 hrs

AEMO ELECTRICITY MARKET NOTICE.

This market notice is FOR INFORMATION ONLY.

The Heywood to Tarrone PS 500kV line in Victoria Region is planned out of service DAILY from 0630 hrs on 05 October 2016 to 1530 hrs on 07 October 2016.

During this outage, a credible contingency can separate South Australia region from the rest of the NEM.

Under these circumstances, 35 MW of Raise and Lower regulation FCAS will be sourced from South Australia for the duration of this outage. In addition, consistent with AEMO existing procedures, adequate contingency FCAS lower requirements will also be sourced from South Australia at times when power transfer is from South Australia to Victoria.

The following constraint sets have been invoked for this outage:

F-V-HYTR (includes F-S_LREG_0035 and F-S_RREG_0035)
S-X_BC_CP
V-HYTR

Refer AEMO Network Outage Schedule (NOS) for further details.

AEMO will continue monitoring this proposed outage and will update the Market accordingly.


Edmund Hon
AEMO Operations
54858INTER-REGIONAL TRANSFER07/09/2016 03:41:53 PM

Inter-Regional Transfer Limit Variation - Directlink - NSW Region 7 September 2016

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer Limit Variation - Directlink - NSW Region - 7 September 2016

The outage of the DC3 pole of Directlink was scheduled to complete at 1700 hrs 9/09/16.

The outage has completed early.

The following constraint set for this outage was revoked at 1510 hrs.
N-X_MBTE_2

The constraint set contains the following interconnector on the left hand side:
N-Q-MNSP1

See AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
54857ADMINISTERED PRICE CAP07/09/2016 03:55:23 AM

[EventId:91] AP STARTED for market ancillary services in SA at 07 September 2016 04:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0355 hrs on 7 September 2016

ADMINISTERED PRICE PERIOD DECLARED in SA region.

AEMO has determined that the rolling sum of the uncapped market ancillary Lower Reg, Raise Reg services(s) prices for the SA region over the previous 2016 dispatch intervals has exceeded 6 times the cumulative price threshold (CPT) of $210,100.00.

In accordance with Clause 3.14 of the National Electricity Rules, AEMO has determined that an administered price period will commence at the dispatch interval starting 0400 hrs on 7 Sep 2016 and will continue through to the end of that trading day.

An administered price cap (APC) of 300 $/MWh will apply to all dispatch intervals during this administered price period. This APC will apply to all market ancillary service prices in the SA region.

An administered floor price (AFP) of 0 $/MWh AFP will apply to all market ancillary service prices.

AEMO will continue to monitor the rolling sum of the uncapped market ancillary service prices and issue further market notices as required.


This is an AEMO autogenerated Market Notice.
54856ADMINISTERED PRICE CAP07/09/2016 03:55:07 AM

[EventId:90] AP ENDED for market ancillary services in SA at 07 September 2016 04:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0355 hrs on 7 September 2016

ADMINISTERED PRICE PERIOD ENDS in SA region.

In accordance with Clause 3.14.2(b) of the National Electricity Rules, AEMO is notifying market particpants that the administered price period declared for the SA region in market notice 54852 will end at 0400 hrs on 7 September 2016.


This is an AEMO autogenerated Market Notice.
54855MARKET SYSTEMS06/09/2016 08:16:28 PM

Planned System Maintenance - Gas Supply Hub Production Site Transfer - Completed

Change Number: CHG0039839

Notification issued to: Market Notice


Notification Type: Completed

Change Type: Normal

Service/ Component: Gas Supply Hub

Change Title: Planned System Maintenance - Gas Supply Hub Production Site Transfer

Change Description:
Successfully completed.

Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.



54854RESERVE NOTICE06/09/2016 03:11:31 PM

RESERVE NOTICE MT PASA PUBLICATION 06 SEPTEMBER 2016

AEMO ELECTRICITY MARKET NOTICE

The MT PASA RELIABILITY_LRC results published on 06 September 2016 forecast shows low reserve conditions (LRC) in South Australia for Summer 2016-17 and Summer 2017-18. The results also shows LRC in Queensland for Summer 2017-18. AEMO will continue to monitor the situation and take appropriate actions, if necessary.

The MT PASA results for the next 24 months are summarised at:
http://www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Data-dashboard#medium-term-outlook

This notice supersedes Market Notice 54802 published on 30 August 2016.

Please find the following information on some key inputs used in MT PASA:

Static minimum reserve levels (MRLs) have been specified for QLD, NSW and TAS regions as follows:

QLD: 913 MW
NSW: -1564 MW
TAS: 144 MW

The following optimum shared minimum reserve levels between Victoria and South Australia regions have been specified:

VIC Reserve >= 205.00
5.88 * VIC Reserve + SA Reserve >= 1237.88
1.33 * VIC Reserve + SA Reserve >= 228.00
0.43 * VIC Reserve + SA Reserve >= -40.53
0.23 * VIC Reserve + SA Reserve >= -147.55
SA Reserve >= -368.00

In order to remain consistent with the calculation of the minimum reserve levels, the following interconnector headroom constraints (net import/export limit constraints) have also been applied in MT PASA:

QLD: 0 MW of maximum net import into QLD.
NSW: 330 MW of minimum net export from NSW.
VIC: 940MW of maximum net import into VIC.
SA: 0 MW of maximum net import into SA.

Demand Side Participation included in MT PASA are:

Summer: QLD 147.5 MW, NSW 248.5 MW, VIC 141.8 MW, SA 120.2 MW and TAS 43 MW

Winter: QLD 147.5 MW, NSW 248.5 MW, VIC 85 MW, SA 120.2 MW and TAS 43 MW

Supply Planning
AEMO
54853RESERVE NOTICE06/09/2016 07:19:00 AM

Actual LOR2 South Australia Region - 06 Sept 2016

AEMO ELECTRICITY MARKET NOTICE

Actual LOR2 South Australia Region - 06 Sept 2016

Refer AEMO Electricity Market Notice 54686

An Actual LOR2 condition is declared for the South Australia region from 0710 hrs until further notice due to the planned outage of the Heywood No.2 500 kV busbar.

If a credible contingency event occurs during this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.


Manager NEM Real Time Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm