-
-
NEM Lack of Reserve Framework Quarterly Reports
-
In this section
-
In this section
- Power system operating procedures
- NEM Lack of Reserve Framework Quarterly Reports
- NEM System Restart Information Sessions
- Schedules for Delegations
-
-
In accordance with clause 4.8.4B of the National Electricity Rules, AEMO is required to publish, on a quarterly basis, a report on the operation of the Lack of Reserve Framework.
Previous Quarterly Reports
- NEM Lack of Reserve Framework Report – quarter ending 30 June 2018 (415 KB, pdf)
- NEM Lack of Reserve Framework Report – Stats quarter ending 30 June 2018 (55 KB, xlsx)
- NEM Lack of Reserve Framework Report – quarter ending 31 March 2018 (382 KB, pdf)
- NEM Lack of Reserve Framework Report – Stats quarter ending 31 March 2018 (53 KB, xlsx)
NEM Lack of Reserve Framework Training Report
This report has been published in accordance with the first NEM Lack of Reserve Framework Report published on 30 April 2018 , which stated that AEMO will publish a report following retraining of the Bayesian Belief Network. This report summarises the outcomes following the retraining of the Bayesian Belief Network to include data up to and including 31 March 2018.
The retrained Bayesian Belief Network was implemented on 13 June 2018.