AEMO has established the Connection Initiatives program to develop a number of policies and guidelines, in consultation with the energy industry, aimed at improving and clarifying the process for connections and augmentations in Victoria.
The Victorian Electricity Transfer Limits Manual was produced by VENCorp. The manual contains transfer limit equations and related information for the Victorian power system and its interconnections with the power systems of New South Wales, South Australia and Tasmania.
The Victorian Electricity Transfer Limits manual is currently being updated. Some sections of the manual are unavailable at present.
| Victorian Import Limits Under System Normal Conditions 24 Jul 2003 | filename: v173-0001.doc |
|
| Victorian Maximum Supportable Demand for 2007/08 27 Nov 2007 | filename: v173-0002.doc |
|
| Victorian Import Limits based on Voltage Collapse with Prior Transmission Outages 14 Nov 2007 | filename: v173-0003.doc |
This report contains the demand forecasts for point of connection within the Victorian transmission network.
| Victorian Terminal Station Demand Forecasts 2011/12 – 2021/22 30 Sep 2011 | filename: 0400-0045.pdf |
|
| Victorian Electricity Forecast Report 2009 |
Victorian Electricity Transmission Network Connection Augmentation Guideline
|