The purpose of this procedure is to assist AEMO operational personnel to identify assess and manage situations which require direction, intervention, the dispatch of plant provided under a reserve contract or the issue of clause 4.8.9 instructions.
Change from the previous version include:
For further information on this document, please contact: Robert Rigoni, Power System Operations Manager.
| Intervention, Direction and Clause 4.8.9 Instructions SO_OP3707 Version 17 | 06 Jul 2011 | filename: so_op3707v017.pdf |