Proposed Generation Projects

This table lists generation projects (including generation upgrades) which do not yet meet AEMO's criteria for consideration as a committed project. The capacity of these proposed projects is not considered by AEMO when assessing the supply-demand outlook.

Generation projects are assessed by AEMO against five criteria.

  • Site - The project proponent has leased or acquired, or commenced legal proceedings to lease or acquire, land for the construction of the project.
  • Major Components - Contracts for the supply and construction of major plant or equipment (generators, turbines, boilers, transmission towers and conductors), including contract provisions for project cancellation payments, have been executed.
  • Planning Consents - The project proponent has obtained all required planning and construction approvals and licences, including completed and approved environmental impact statements (which include planning and environmental approvals from duly authorised planning bodies at both State and Federal Government levels).
  • Finance - Financing arrangements for the proposal, including debt plans, have been finalised and contracts executed.
  • Construction Date - Construction has either commenced or a firm date has been set for it to commence.

To be considered committed a generation project must meet all five criteria. Generation projects which do not meet all five criteria listed above are reported as proposed projects on this page.

A proposed generation project which fully satisfies at least three criteria is further classed an Advanced Proposal.

All other proposed generation projects are classed as Publicly Announced.

>> back to main page

- Satisfied  - Partially Satisfied

Company / Operator Project Technology Region Commissioning Date Site Major Comp'ts Planning Consents Finance Firm Contruct Date Set Status
Delta Electricity  Bamarang, CCGT, 450 MW   CCGT  NSW1  Summer 2012/13  Satisfied          Publicly Announced 
Delta Electricity  Marulan gas turbine, CCGT, 420 MW   CCGT  NSW1  Summer 2013/14  Satisfied          Publicly Announced 
Delta Electricity  Mt Piper Power Station expansion, two additional base load units., 2000 MW   Coal  NSW1  Summer 2015/16  Satisfied          Publicly Announced 
Eraring Energy  Eraring upgrade , Unit 1 increase to 720 MW   Coal  NSW1  December 2011  Satisfied  Partially Satisfied  Satisfied    Satisfied  Publicly Announced 
Eraring Energy  Eraring Upgrade, Unit 4 upgrade increase to 720 MW   Coal  NSW1  September 2012  Satisfied    Satisfied    Satisfied  Publicly Announced 
AGL Energy  Leaf's Gully Power Station, 360 MW   Gas  NSW1  January 2012  Satisfied      Satisfied    Publicly Announced 
Eastern Star  Wilga Park 'B' Station (Unit 1 & 2), 2*2.9 MW   Gas  NSW1  Mid 2010  Satisfied    Satisfied      Publicly Announced 
Eastern Star  Wilga Park 'B' Station (Unit 3 to 10), 8*2.9   Gas  NSW1  Not Identified  Satisfied    Satisfied      Publicly Announced 
Delta Electricity  Bamarang, OCGT, 330 MW   OCGT  NSW1  Summer 2012/2013  Satisfied    Satisfied      Publicly Announced 
Delta Electricity  Marulan gas turbine, OCGT, 330 MW   OCGT  NSW1  Summer 2013/14  Satisfied          Publicly Announced 
ERM Power  Wellington Power Station (Unit 1-4),, 692 MW winter, 616 MW summer   OCGT  NSW1  November 2011  Satisfied    Satisfied      Publicly Announced 
ERM Power  Wellington Power Station (Unit 5), 300 MW winter, 280 MW summer   OCGT  NSW1  December 2012  Satisfied          Publicly Announced 
International Power  Parkes, OCGT, 150 MW   OCGT  NSW1  Not identified            Publicly Announced 
International Power  Buronga, OCGT, 120-150 MW   OCGT  NSW1  Not identified            Publicly Announced 
Macquarie Generation  Tomago Gas Turbine Station, OCGT, 500 MW   OCGT  NSW1  Not identified  Satisfied    Satisfied      Publicly Announced 
Energy Australia  Woodlawn Bioreactor (Unit 7 to Unit 12), 1.065 MW each   Thermal - Landfill Gas  NSW1  Staged - summer 2015/16 to winter 2020  Satisfied          Publicly Announced 
Energy Australia  Woodlawn Bioreactor Expansion (Unit 4 to Unit 6), 1.065 MW each   Thermal - Landfill Gas  NSW1  Winter 2011 till Summer 2013/14  Satisfied    Satisfied  Satisfied  Satisfied  Advanced Proposal 
Acciona Energy  Gunning Wind Farm, 47 MW   Wind  NSW1  Summer 2010/11  Satisfied    Satisfied    Satisfied  Advanced Proposal 
Epuron  Gullen Range Wind Farm, 193 MW   Wind  NSW1  Summer 2010/11  Satisfied          Publicly Announced 
Epuron  Silverton Wind Farm, 430 MW (Stage 1), 1,260 MW Ultimate   Wind  NSW1  February 2011 (Stage 1), December 2011 (Stage 2)  Satisfied          Publicly Announced 
Origin Energy  Conroys Gap Wind Farm, 30 MW   Wind  NSW1  Not Identified  Satisfied    Satisfied      Publicly Announced 
Origin Energy  Snowy Plains, 28 MW   Wind  NSW1  Not Identified  Satisfied    Satisfied      Publicly Announced 
Transfield Services  Collector Wind Farm, 149 MW   Wind  NSW1  December 2016            Publicly Announced 
Union Fenosa  Crookwell II Wind Farm, 92 MW   Wind  NSW1  August 2010  Satisfied    Satisfied      Publicly Announced 
Union Fenosa  Paling Yards Wind Farm, 76 MW   Wind  NSW1  September 2011  Satisfied          Publicly Announced 
Wind Prospect  Boco Wind Farm, 350 MW   Wind  NSW1  January 2012  Satisfied          Publicly Announced 
CS Energy  Swanbank F Power Station,, 400 MW winter, 380 MW summer   CCGT  QLD1  Not Identified  Satisfied    Partially Satisfied      Publicly Announced 
Origin Energy  Spring Gully Power Station, CCGT, 1,000 MW   CCGT  QLD1  Not identified  Satisfied    Satisfied  Satisfied    Advanced Proposal 
ERM Power  Braemar 3,unit 2 and 3, 519 MW winter, 462 MW summer   Gas  QLD1  March 2012  Satisfied          Publicly Announced 
ERM Power  Braemar 4,unit 1 and 2, 473 MW winter, 434 MW summer   Gas  QLD1  December 2013  Satisfied          Publicly Announced 
Tranfield Services  Windy Hill II Wind Farm, 13 MW   Wind  QLD1  December 2016            Publicly Announced 
Transfield Services  Bowen Wind Farm, 101 MW   Wind  QLD1  December 2014            Publicly Announced 
Transfield Services  Credition Wind Farm, 40 MW   Wind  QLD1  December 2016            Publicly Announced 
Transfield Services  Crows Nest Wind Farm, 40 MW   Wind  QLD1  December 2016            Publicly Announced 
Transfield Srvices  High Road Wind Farm, 50 MW   Wind  QLD1  December 2015            Publicly Announced 
Infratil Energy  Lonsdale 2 Expansion, 28 MW   Biodiesel  SA1  January 2010  Satisfied          Publicly Announced 
Strike Oil  Kingston Power Station, 40 MW   Coal  SA1  By 2015            Publicly Announced 
International power  Pelican Point Stage Two, additional generation, 300 MW   Gas  SA1  Not identified  Satisfied        Satisfied  Publicly Announced 
Altona Resources  Arkaringa Power Station, Gas/Coal IGCC, 560 MW   IGCC  SA1  November 2014            Publicly Announced 
Acciona Energy  Allendale Wind Farm, 71 MW   Wind  SA1  Winter 2015  Satisfied    Satisfied      Publicly Announced 
AGL Energy  Hallett III (Mt Bryan), 90 MW   Wind  SA1  October 2011  Satisfied      Satisfied    Publicly Announced 
International Power  Willogoleche, 26 Units, 50 MW   Wind  SA1  Not Identified            Publicly Announced 
NP Power  Lincoln Gap Wind Farm, 118 MW   Wind  SA1  June 2011  Satisfied          Publicly Announced 
Pacific Hydro  Carmodies Wind Farm, 140 MW   Wind  SA1              Publicly Announced 
Transfield Services  Barn Hill Wind Farm, 130 MW   Wind  SA1  September 2011  Satisfied  Satisfied  Satisfied      Publicly Announced 
Transfield Services  Mount Hill Wind Farm, 80 MW   Wind  SA1  December 2019            Publicly Announced 
Transfild Services  Kulpara Wind Farm, 109 MW   Wind  SA1  December 2018            Publicly Announced 
TrustPower  Snowtown Wind Farm Stage II, 206 MW   Wind  SA1  By 2011  Satisfied    Satisfied  Satisfied    Advanced Proposal 
Gunns  Bell Bay Pulp Mill Power Plant, 176 MW winter, 184 Summer   Biomass  TAS1  By 2012  Satisfied  Satisfied  Satisfied      Advanced Proposal 
Eureka Funds Management  White Rock Wind Farm, 300 MW   Wind  TAS1  June 2014  Satisfied          Publicly Announced 
Roaring 40s  Mussleroe, 117 MW   Wind  TAS1  By 2011  Satisfied    Satisfied    Satisfied  Advanced Proposal 
Origin Energy  Mortlake Stage 2, 500 MW winter, 470 MW summer   CCGT  VIC1  Not Identified  Satisfied    Satisfied  Satisfied    Advanced Proposal 
Santos  Shaw River Power Station, 500 MW   CCGT  VIC1  June 2012  Satisfied          Publicly Announced 
AGL Energy  Tarrone Power Station, 500 MW   Gas  VIC1  January 2012  Satisfied      Satisfied    Publicly Announced 
HRL and Harbin Power Engineering Company  Integrated Drying and Gasification Combined-Cycle (IDGCC) technology, Latrobe Valley, 500 MW   IDGCC  VIC1  End 2013  Satisfied          Publicly Announced 
Energy Response  Coles Tooronga Head Office, 3 MW   Other  VIC1  March 2009  Satisfied  Satisfied    Satisfied  Satisfied  Publicly Announced 
Solar Systems  Solar Systems Victorian Solar Energy Facility (Unit 1), 2 MW   Solar Concentrator  VIC1  December 2010  Satisfied      Satisfied    Publicly Announced 
Solar System  Solar System Victorian Solar Energy Facility (Unit 2-51), 100 MW   Solar Concentrator  VIC1  December 2012  Satisfied      Satisfied    Publicly Announced 
Solar System  Solar Systems Victorian Solar Energy Facility (Unit 52-77), 54 MW   Solar Concentrator  VIC1  December 2013  Satisfied      Satisfied    Publicly Announced 
Acciona Energy  Mortlake Wind Farm, 144 MW   Wind  VIC1  Summer 2013/14  Satisfied    Satisfied      Publicly Announced 
Acciona Energy  Berrimal, 24 MW   Wind  VIC1  Summer 2016/17  Satisfied    Satisfied      Publicly Announced 
Acciona Energy  Newfield, 23 MW   Wind  VIC1  Summer 2017/18  Satisfied    Satisfied      Publicly Announced 
Acciona Energy  Mount Gellibrand Wind Farm, 144 MW   Wind  VIC1  Summer 2012/13  Satisfied    Partially Satisfied      Publicly Announced 
Acciona Energy  Waubra North Wind Farm, 75 MW   Wind  VIC1  Summer 2012/13  Satisfied          Publicly Announced 
AGL Energy  Macarthur Wind Farm, 329 MW   Wind  VIC1  July 2012  Satisfied          Publicly Announced 
International Power  Winchelsea Wind Farm, 14 Units, 28 MW   Wind  VIC1  Not Identified  Satisfied          Publicly Announced 
Pacific Hydro  Portland Wind Farm Stage 4, 54 MW   Wind  VIC1  Summer 2010/11  Satisfied          Publicly Announced 
Pacific Hydro  Crowlands Wind Farm, 144 MW   Wind  VIC1  Not Identified            Publicly Announced 
Transfield Services  Kongorong Wind Farm, 120 MW   Wind  VIC1  December 2017            Publicly Announced 
Transfield Services  Ben More Wind Farm, 90 MW   Wind  VIC1  December 2014            Publicly Announced 
Transfield Services  Baynton Wind Farm, 130 MW   Wind  VIC1  December 2013            Publicly Announced 
Union Fenosa  Berrybank Wind Farm, 200 MW   Wind  VIC1  November 2011  Satisfied          Publicly Announced 
Union Fenosa  Darlington Wind Farm, 300 MW   Wind  VIC1  July 2012  Satisfied          Publicly Announced 
Union Fenosa  Hawkesdale Wind Farm, 62 MW   Wind  VIC1  December 2010  Satisfied    Satisfied      Publicly Announced 
Union Fenosa  Ryan Corner Wind Farm, 136 MW   Wind  VIC1  December 2010  Satisfied    Satisfied      Publicly Announced 
West Wind  Mt Mercer, 131 MW   Wind  VIC1  By 2012  Satisfied    Satisfied      Publicly Announced 
West Wind  Lal Lal Wind Farm, 131 MW   Wind  VIC1  By 2013  Satisfied          Publicly Announced 
Wind Farm Development  Naroghid Wind Farm, 42 MW   Wind  VIC1  By 2011  Satisfied    Satisfied      Publicly Announced 
Wind Farm Development  Woolsthrope Wind Farm, 40 MW   Wind  VIC1  By 2011  Satisfied    Satisfied      Publicly Announced 
Wind Farm Development  The Sisters, 24 MW   Wind  VIC1  2011  Satisfied          Publicly Announced 
Wind Farm Development  Drysdale, 26 MW   Wind  VIC1  2011  Satisfied    Satisfied      Publicly Announced 
Wind Power Pty Ltd  Lexton Wind Farm, 38 MW   Wind  VIC1  December 2011  Satisfied    Satisfied      Publicly Announced 
Wind Power Pty Ltd  Bald Hills Wind Farm, 104 MW   Wind  VIC1  June 2011  Satisfied    Satisfied      Publicly Announced 

 

Region Project Technology Owner/Operator Installed Capacity (MW)
NSW1  Lucas Heights I   Thermal - Landfill Gas  EDL  4.6 
Hunter Economic Zone   Biodiesel  Infratil Energy  29 
Awaba Power Station   Biomass  Infratil Energy 
EarthPower Biomass Plant   Biomass  Country Energy 
Broken Hill GT   Gas  Country Energy  50 
Eraring Power Station Gas Turbine   Gas  Eraring Energy  42 
Glennies Creek   Gas (Methane)  Envirogen  13 
Teralba   Gas (Methane)  Envirogen 
Brown Mountain   Hydro  Eraring Energy 
Burrendong Hydro   Hydro  AGL Energy  15 
Burrinjuck Power Station   Hydro  Eraring Energy  28 
Copeton Hydro   Hydro  AGL Energy  24 
Glenbawn Hydro   Hydro  AGL Energy 
Jindabyne Small Hydro   Hydro  Snowy Hydro 
Keepit Power Station   Hydro  Eraring Energy 
Pindari Hydro   Hydro  AGL Energy 
Warragamba Power Station   Hydro  Eraring Energy  50 
Wyangala   Hydro  Country Energy  18 
Broadwater   Thermal – Bagasse Cogeneration  Delta Electricity  30 
Condong   Thermal – Bagasse Cogeneration  Delta Electricity  30 
Appin Power Plant   Gas (Methane)  EDL  56 
Lucas Heights II   Thermal - Landfill Gas  EDL  13 
Lucas heights II Stage II   Thermal - Landfill Gas  Country Energy  18 
Tower Power Plant   Thermal - Landfill Gas  EDL  41 
Woodlawn Bioreactor Energy Generation Station   Thermal - Landfill Gas  Energy Australia 
Blayney   Wind  Eraring Energy  10 
Crookwell   Wind  Eraring Energy 
Nymboida Power Station   Hydro  Country Energy 
West Nowra   Thermal - Landfill Gas  AGL Eenergy 
The Drop   Hydro  Pacific Hydro 
Mugga Lane   Thermal - Landfill Gas  EDL 
Tahmoor Power Station   Gas (Methane)  Envirogen 
Eastern Creek 2 Gas Utilisation Facility   Thermal - Landfill Gas  LMS Generation  10 
Eastern Creek   Thermal - Landfill Gas  AGL Energy 
Grange Avenue   Thermal - Landfill Gas  AGL Energy 
Jacks Gully   Thermal - Landfill Gas  AGL Energy 
Wilga Park "A" Power Station   Gas  Eastern Star  12 
Regional subtotal:575
QLD1  Inkerman Mill   Bagasse  CSR  11 
Kalamia Sugar Mill   Bagasse  CSR 
Macknade Mill   Bagasse  CSR 
Plane Creek Mill   Bagasse  CSR  14 
Victoria Mill   Bagasse  CSR  12 
Invicta Mill   Bagasse  CSR  39 
Pioneer Sugar Mill   Bagasse  CSR  68 
Rocky Point Cogeneration Plant   Biomass  Rocky Point Green Power  28 
Oaky Creek   Gas (Methane)  Envirogen  15 
Wivenhoe Small Hydro   Hydro  Stanwell Corporation 
Daandine Power Station   Thermal - Landfill Gas  Country Energy  33 
Rochedale   Thermal - Landfill Gas  Country Energy 
Whitwood Road Renewable Energy Facility   Thermal - Landfill Gas  Country Energy 
Windy Hill   Wind  Transfield Services  12 
ISIS Central Sugar Mill Cogen   Gas  AGL Energy  25 
Roghan Road   Thermal - Landfill Gas  AGL Energy 
Moranbah   Thermal - Landfill Gas  AGL Energy  13 
Suncoast Gold Macadamias   Biomass  AGL Energy 
KRC Castlemaine Cogen   Thermal - Landfill Gas  AGL Energy 
Veolia Ti Tree Bio Reactor   Thermal - Landfill Gas  Veolia Environmental Services 
Moranbah North Power Station   Gas (Methane)  EDL  46 
Browns Plains   Thermal - Landfill Gas  EDL 
German Creek   Thermal - Landfill Gas  AGL Energy  32 
Tarong Gas Turbine   Gas  Tarong Energy  15 
Kareeya   Hydro  Stanwell Corporation 
Regional subtotal:409
SA1  Lonsdale Power Station   Diesel  Infratil Energy  20 
Terminal Storage Mini Hydro   Hydro  Hydro Tasmania 
Canunda   Wind  International Power  46 
Cathedral Rocks Wind Farm   Wind  Roaring 40s  66 
Lake Bonney Wind Farm   Wind  Infigen Energy  81 
Mount Millar Wind Farm   Wind  Transfield Services  70 
Starfish Hill   Wind  Transfield Services  35 
Wattle Point WF   Wind  AGL Energy  91 
Wingfield I and II   Thermal - Landfill Gas  EDL 
Amcor Gawler Glass Bottle Plant   Diesel  Energy Response 
Pedler Creek   Thermal - Landfill Gas  EDL 
Regional subtotal:426
TAS1  Butlers Gorge   Hydro  Hydro Tasmania  14 
Cluny   Hydro  Hydro Tasmania  17 
Paloona   Hydro  Hydro Tasmania  28 
Repulse   Hydro  Hydro Tasmania  28 
Rowallan   Hydro  Hydro Tasmania  11 
Tods Corner   Hydro  Hydro Tasmania 
Remount Power Station   Thermal - Landfill Gas  Infratil Energy 
Woolnorth Bluff Point Wind Farm   Wind  Roaring 40s  65 
Woolnorth Studland Bay Wind Farm   Wind  Roaring 40s  75 
Regional subtotal:240
VIC1  Clover Power Station   Hydro  AGL Energy  24 
Longford Plant   OCGT  TRUenergy  31.8 
Portland Wind Farm (PWEP 2)   Wind  Pacific Hydro  58 
Portland Wind Farm (PWEP 3)   Wind  Pacific Hydro  44 
Waubra Wind Farm   Wind  Acciona Energy  192 
Banimboola Power Station   Hydro  AGL Energy  13 
Rubicon Mountain Streams Station   Hydro  AGL Energy  14 
Yarrawonga Hydro   Hydro  AGL Energy  10 
Berwick Power Plant   Thermal - Landfill Gas  EDL 
Broadmeadows Power Plant   Thermal - Landfill Gas  EDL 
Clayton Power Plant   Thermal - Landfill Gas  EDL  11 
Mornington Waste Disposal Facility   Thermal - Landfill Gas  Energy Australia 
Challicum Hills Wind Farm   Wind  Pacific Hydro  53 
Codrington Wind Farm   Wind  Pacific Hydro  18 
Toora Wind Farm   Wind  Transfield  21 
Wonthaggi Wind Farm   Wind  Wind Power  12 
Yambuk (Portland Stage 1) Wind Farm   Wind  Pacific Hydro  30 
Springvale Power Plant   Thermal - Landfill Gas  EDL 
Wyndham Waste Disposal Facility   Thermal - Landfill Gas  Energy Australia 
Brooklyn Landfill   Thermal - Landfill Gas  AGL Energy 
Shepparton Waste Water Treatment Facility   Biomass  Diamond Energy 
Eildon Hydro   Hydro  Pacific Hydro 
Hallam Road   Thermal - Landfill Gas  LMS Generation 
Glenmaggie Hydro   Hydro  Pacific Hydro 
Tatura Biomass Generator   Biomass  Diamond Energy 
Wollert   Thermal - Landfill Gas  LMS Generation 
Ballarat Base Hospital   Gas  Energy Response 
South East Water Hallam Hydro Plant   Hydro  Progressive Green  0.3 
William Hovel Hydro   Hydro  Pacific Hydro 
Regional subtotal:576
Region Project Commissioning Date Technology Owner/Operator Installed Capacity (MW)
NSW1  Cullerin Range Wind Farm   June 2009  Wind  Origin Energy  30 
Capital Wind Farm   June 2009  Wind  Babcock & Brown Power  141 
Journama Mini Hydro   October 2009  Hydro  Snowy Hydro  12 
Wilga Park 'A' Power Station   May 2009  Gas  Eastern Star 
Woodlawn Bioreactor Expansion (Unit 3)   February 2010  Thermal - Landfill Gas  Energy Australia 
Charlestown Square Cogeneration Plant   October 2010  Gas  The GPT Group 
Summer Hill   Winter 2009  Thermal - Landfill Gas  LMS Generation 
Regional subtotal:192
QLD1  Oaky Creek Power Station Upgrade   June 2009  Gas  Envirogen 
Regional subtotal:6
TAS1  Lake Margaret (Redevelopment)   July 2009  Hydro  Hydro Tasmania 
Regional subtotal:8