- Ergon Energy Corporation Limited Request For Information – Supply To Bundaberg Area Emerging Distribution Network Constraint - 11 Mar 2010
- Transgrid Proposed New Large Transmission Network Asset Development Of Electricity Supply To The Nowra Area - 05 Mar 2010
- Energex Proposed Establishment of a 33/11 kV Zone Substation at Whinstanes (WSS) - 05 Mar 2010
- EnergyAustralia Distribution Network Consultation Paper – Development of Tomago Zone Substation - 04 Mar 2010
- Energex TSN TENNYSON – STL ST LUCIA Establish 33 kV DCCT UG Feeders and Decommission Existing F573 & F574 (TRG-STL) - 03 Mar 2010
- Aurora Energy and Transend Networks, Network Consultation Paper - Proposed Development of the Electricity Supply Network in the Kingston Area - 24 Feb 2010
- Energex Project Approval Report - MDR MOLENDINAR – Establish two new 11kV feeders to the Gold Coast University Hospital (SSGHP) - 19 Feb 2010
- Energex Project Approval Report - T16 NAMBOUR – Install 1 x 20 Mvar 33 kV Capacitor Bank - 19 Feb 2010
- Energex Project Approval Report - SMF SAMFORD – Upgrade Substation Capacity - 19 Feb 2010
- Energex Project Approval Report - LBS Lytton Bulk Supply – Replace 33/11 kV Transformer TR2 and Install 1 x 5.4 Mvar Capacitor Bank - 19 Feb 2010
- Ergon Energy Corporation Limited Final Report – Supply To Northern Toowoomba Area Emerging Distribution Network Constraint - 16 Feb 2010
- Transend Networks Consultation - Extension of network support arrangements in southern Tasmania - 12 Feb 2010
- ElectraNet Proposed New Transmission Network Asset : Templers Supply Augmentation - 11 Feb 2010
- Ergon Energy Corporation Limited Request For Information : Supply To Mackay Northern Beaches Area Emerging Distribution Network Constraint - 09 Feb 2009
- Energex Project Approval Report : Proposed Establishment of a 110/33 kV Bulk Supply Substation at Coorparoo (CPR) and Two 33 kV Underground Feeders from Coorparoo (CPR) to Holland Park (HPK) - 3 Feb 2010
- Energex Project Approval Report : CBT CABOOLTURE – Upgrade 33/11 kV Zone Substation - 1 Feb 2010
- Energex Project Approval Report : SMF Samford – Establish a New 11 kV Feeder to Relieve SMF3A & Reliability Work on Adjacent Feeders - 1 Feb 2010
- Energex Project Approval Report : NGE - Nudgee Establish a new 11kV feeder from Nudgee Substation - 1 Feb 2010
- Energex Project Approval Report : NSD Newstead Establish New 11 kV Feeder to Relieve CGT5 and Improve Reliability in the Area - 1 Feb 2010
- Energex Project Approval Report : MGL Moggill Establish New 11 kV Feeder to Relieve MGL5 and Improve Reliability in the Area - 1 Feb 2010
- Energex Project Approval Report : CNA Cooneana – Upgrade and Extend CNA8A and CNA9A 11kV feeders south into the Ripley Valley interchange - 1 Feb 2010
- Energex Project Approval Report : BHD Burleigh Heads – Establish a new 11kV feeder to the Southeast and improve reliability on 11kV feeders BHD3A, BHD23A & BHD35A - 1 Feb 2010
- Ergon Energy Request For Information : Supply To Maryborough North Area Emerging Distribution Network Constraint - 28 Jan 2009
- Aurora Energy and Transend Networks, Network Consultation Paper - Proposed Development of the Electricity Supply Network in the Launceston Area - 21 Jan 2010
- EnergyAustralia Annual Electricity System Development Review 2009/2010 (ESDR) -21 Jan 2010
- EnergyAustralia Transmission Network Dual Function Final Report – Development of 132/11kV Charlestown Zone Substation - 21 Jan 2010
- EnergyAustralia Distribution Network Final Report – Castle Cove 11kV Zone Development - 21 Jan 2010
- AEMO Application Notice for Funded Augmentation for Mortlake Power Station Connection - 13 Jan 2010
- Integral Energy Network Consultation Paper : West Tomerong 132/33kV Transmission Substation Establishment - 29 Dec 2009
- EnergyAustralia Transmission Network Final Report - Rose Bay 132kV Conversion and Installation of 132kV Feeders - 29 Dec 2009
- EnergyAustralia Distribution Network Consultation Paper – Development of Rhodes 132/11kV Zone Substation - 29 Dec 2009
- EnergyAustralia Distribution Network Consultation Paper – Kirrawee 132/11kV Zone Augmentation - 29 Dec 2009
- ENERGEX T11 CABOOLTURE – Replace 110/33 kV Transformer and Install 2 x 110 kV Bus Section Circuit Breakers - 23 Dec 2009
- ENERGEX GNA GOODNA – Establish 33/11 kV Zone Substation - 23 Dec 2009
- AEMO / United/ SP Ausnet Joint Final Report : East Rowville Terminal Station new 220/66kV Transformer - 22 Dec 2009
- AEMO / United Energy / SP AusNet Joint Final Report - Small Network Augmentation : Cranbourne Terminal Station New 220/66 Kv Transformer - 22 Dec 2009
- ENERGEX Project Approval Report : HIS HOPE ISLAND – Establish a new 11kV feeder to the Southwest - 04 Dec 2009
- ENERGEX CBT CABOOLTURE – Upgrade 33/11 kV Zone Substation - 04 Dec 2009
- ENERGEX IPL INNISPLAIN – Reliability Improvement to 11kV feeder IPL1 - 04 Dec 2009
- EnergyAustralia and Transgrid - Proposed New Large Transmission Network Asset Development of Electricity Supply to the Sydney CBD and Inner Metropolitan Area - 04 Dec 2009
- ENERGEX SMF Samford – Establish a New 11 kV Feeder to Relieve SMF3A & Reliability Work on Adjacent Feeders - 25 Nov 2009
- ENERGEX MTN Myrtletown – PAV Pandanus Avenue Establish 33 kV Double-Circuit Underground Feeders Energised at 11 kV - 24 Nov 2009
- ActewAGL Distribution Network Augmentation Plan Consultation Paper: New Eastlake 132/11KV Zone Substation - 20 Nov 2009
- ENERGEX Project Approval Report: CMD CURRIMUNDI – Install 2nd 30 MV.A 132/11 kV Transformer - 18 Nov 2009
- ENERGEX Project Approval Report - CLEVELAND - New Feeder West, existing CB - 16 Nov 2009
- ENERGEX Project Approval Report - NUDGEE - Upgrade Nudgee Bulk Supply Substation - 16 Nov 2009
- ENERGEX Project Approval Report - RUNCORN – Replace 2 x 33/11 kV Transformers - 16 Nov 2009
- Ergon Energy Corporation Limited Final Report : Supply To Maryborough And Hervey Bay Area Emerging Distribution Network Constraint - 16 Nov 2009
- Powerlink Request for Information : Managing Emerging Limitations between Stanwell and Broadsound - 12 Nov 2009
- Powerlink Request for Information : Maintaining a Reliable Electricity Supply within Central Queensland - 12 Nov 2009
- EnergyAustralia Distribution Network Final Report : Castle Cove and Mosman Zone 11kV Capacitors - 12 Nov 2009
- Electranet Proposed New Large Network Asset - Eastern Hills South Australia - Final Report Summary - 9 Nov 2009
- ElectraNet Final Report New Large Network Asset – Kadina East - 6 Nov 2009
- ENERGEX Final Report : Establish 33/11 kV Zone Substation at Springfield Central (SFC) - 4 Nov 2009
- ENERGEX Final Report : Reconstruct 33/11 kV Zone Substation at Woodridge (WRG) - 4 Nov 2009
- ENERGEX Final Report : Establish 33/11 kV Zone Substation at Burpengary (BGY) - 4 Nov 2009
- ENERGEX Final Report : Establish 110/33 kV Bulk Supply Substation at Griffin (GFN) - 4 Nov 2009
- ENERGEX Final Report : Proposed Reconstruction of the Beerwah Bulk Supply and Zone Substations (BWH) - 4 Nov 2009
- EnergyAustralia Distribution Network Final Report : Botany Zone 11kV Feeders Development - 27 Oct 2009
- ElectraNet Proposed New Transmission Network Asset – Templers Supply Augmentation - 26 Oct 2009
- Ergon Energy Corporation Limited Request for Information – Supply to Northern Toowoomba Area Emerging Distribution Network Constraint - 07 Oct 2009
- ENERGEX final report : Springfield Proposed Establishment of a 132/11 kV Substation at Pacific Paradise (PPD) and Double Circuit 132 kV Overhead Feeders from Palmwoods to Pacific Paradise and West Maroochydore (SunCoast Power Project) - 30 Sep 2009
- Ergon Energy Corporation Limited Consultation & Draft Recommendation – Supply to Maryborough Hervey Bay Area Emerging Distribution Network Constraint - 18 Sep 2009
- ENERGEX consultation report: Proposed Reconstruction of the 110/33 kV Bulk Supply Substation at Springfield Central - 17 Sep 2009
- ENERGEX consultation report: Reconstruct 33/11 kV Zone Substation at Woodridge - 17 Sep 2009
- ENERGEX consultation report: Proposed Reconstruction of the 110/33 kV Zone Substation at Burpengary - 17 Sep 2009
- ENERGEX consultation report: Proposed Reconstruction of the 110/33 kV Bulk Supply Substation at Griffin - 16 Sep 2009
- ENERGEX consultation report: Proposed Reconstruction of the Beerwah Bulk Supply and Zone Substations (BWH) - 16 Sep 2009
- Country Energy Final Report New Large Distribution Network Asset: Construction Of A Single 132kv Powerline From Mullumbimby To Ballina - 03 Sep 2009
- EnergyAustralia Distribution Network Consultation Paper : New SOPA 132/11kV Zone Substation - 31 Aug 2009
- EnergyAustralia Distribution Network Consultation Paper : Upper Hunter Network Development - 27 Aug 2009
- EnergyAustralia Distribution Network Final Report - Development of Gwawley Bay Zone Substation - 26 Aug 2009
- Transgrid & County Energy Proposed New Large Transmission Network Asset - Development of Electricity Supply to the Lower Mid North Coast - 21 Aug 2009
- EnergyAustralia Distribution Network Consultation Paper : Development of Charlestown Zone Substation - 13 Aug 2009
- Ergon Energy Corporation Limited Request for Information – Supply to Maryborough/Hervey Bay Area Emerging Distribution Network Constraint - 10 Aug 2009
- ENERGEX Consultation Report: Suncoast Power Project - 10 Aug 2009
- ENERGEX Project Approval Report: Tamborine Village – Establish 33/11 kV Zone Substation - 10 Aug 2009
- ENERGEX Project Approval Report: SSHTL Hamilton Lands – Replace outdoor 33 kV switchgear and reconfigure 33 kV network - 10 Aug 2009
- ElectraNet and ETSA Utilities summary of Final Report - Adelaide Central Reinforcement - 13 Jul 2009
- ElectraNet and ETSA Utilities proposed New Large Transmission Network Asset and New Distribution Asset – Kadina East Transformer Capacity Increase - 13 Jul 2009
- EnergyAustralia Distribution Network Consultation Paper – Development of Empire Bay 66/11kV Zone Substation - 10 Jul 2009
- EnergyAustralia Distribution Network Final Report – Kurri To Rutherford Augment/Split 33kV Tee Feeder - 03 Jul 2009
- EnergyAustralia Transmission Network Final Report – Establishment of a New 132/11kV CBD Zone Substation - 03 Jul 2009
- Powercor Application Notice : Proposed Augmentation of Bendigo Terminal Station - 3 Jul 2009
- ENERGEX Project Approval Report: Eumundi - Establish 33/11 kV Zone Substation - 01 Jul 2009
- Ergon Energy Corporation Limited Final Report – Supply to Gayndah Area Emerging Distribution Network Constraint - 01 Jul 2009
- Transgrid - NSW Annual Planning Report 2009 - 01 Jul 2009
- EnergyAustralia Transmission Annual Planning Report 2009 - 29 Jun 2009
- EnergyAustralia - Development of 132/11kV Brandy Hill Zone Substation - 29 Jun 2009
- EnergyAustralia Distribution Network Final Report – Wyong Zone Substation 11kV Panel 19 Feeder Development - 26 Jun 2009
- EnergyAustralia Distribution Network Final Report – Marrickville 11kV Zone Development - 25 Jun 2009
- EnergyAustralia Distribution Network Final Report : Commissioning of Third Transformer at Singleton STS & Upgrading of 132kV Feeders 953 & 95RAugmentation - 23 Jun 2009
- Transend and Aurora Energy Proposed New Large Transmission Asset and Proposed New Distribution Asset - Development of the Electricity Supply Network in the Hobart Eastern Shore Area - 23 Jun 2009
- Transgrid & ActewAGL Proposed New Large Transmission Network Asset; Proposed New Small Distribution Network Asset - Development of the Southern Supply to the ACT - 19 Jun 2009
- Ergon Energy Corporation Limited Request For Information : Supply To Magnetic Island Area Emerging Distribution Network Constraint - 18 Jun 2009
- ENERGEX Project Approval Report: Redland Bay – Upgrade 33/11 kV Zone Substation - 12 Jun 2009
- ENERGEX Project Approval Report: Bethania – Upgrade 33/11 kV Zone Substation - 12 Jun 2009
- ENERGEX Project Approval Report: Russell Island – Establish 110/11 kV Zone Substation - 12 Jun 2009
- ENERGEX Project Approval Report: Paddy Gully - Establish Substation - 12 Jun 2009
- ENERGEX Project Approval Report: Eight Mile Plains – Install Additional 11 kV Switchgear and 2 x 5.4 Mvar 11 kV Capacitor Bank - 12 Jun 2009
- EnergyAustralia Distribution Network Final Report – Berowra 11kV Zone Development - 12 Jun 2009
- Powerlink Summary of Final Report - Maintaining a Reliable Electricity Supply to South West and South East Queensland - 05 Jun 2009
- EnergyAustralia Distribution Network Consultation Paper – Cronulla Zone Augmentation - 03 Jun 2009
- Integral Energy Draft Consultation Paper for New Large Network Asset – Nepean Subtransmission Constraints - 29 May 2009
- ENERGEX Final Report: Pimpama East - Proposed Establishment of a 33/11 kV Zone Substation - 29 May 2009
- ENERGEX Final Report: Cooran - Proposed Establishment of a 132/11 kV Zone Substation - 29 May 2009
- Transgrid & County Energy Proposed New Large Transmission Network Asset - Redevelopment of Orange 132/66 kV Substation - 22 May 2009
- Ergon Energy Corporation Limited : Consultation & Draft Recommendation – Supply to Gayndah Area Emerging Distribution Network Constraint - 08 May 2009
- ENERGEX Project Approval Report: Gibson Island – Replace 11 kV Switchgear & Install 11 kV Capacitor Banks - 08 May 2009
- EnergyAustralia and Transgrid Final Report - Redevelopment of Lake Munmorah Zone Substation - 04 May 2009
- EnergyAustralia Distribution Network Final Report – Development of New Balgowlah Zone Substation - 04 May 2009
- ENERGEX Final Report - South Pine to Hays Inlet: Establish 110 kV Double Circuit Overhead Feeders with One Feeder Energised at 33 kV - 29 Apr 2009
- ENERGEX Final Report - Proposed Construction of a 110 kV Feeder from Loganlea to Jimboomba Substation - 29 Apr 2009
- ENERGEX Project Approval Report: Molendinar to Cades County – Establish 2nd 110 kV Feeder and Replace 110/11 kV Transformers TR2 and TR3 - 28 Apr 2009
- ENERGEX Project Approval Report: Kingston - Replace 2 x 25 MV.A 33/11 kV transformers - 28 Apr 2009
- ENERGEX Project Approval Report: Parkinson : Establish 33/11 kV Zone Substation - 28 Apr 2009
- EnergyAustralia Distribution Network Final Report : West Gosford Zone Substation 11kV Distribution Feeder Development - 22 Apr 2009
- EnergyAustralia Distribution Network Consultation Paper : Development of Engadine Zone Substation - 21 Apr 2009
- ENERGEX Project Approval Report: Doboy to Tingalpa / Lota - Uprate and reconfigure 33 kV feeders to transfer SSLTA to SSLBS - 01 Apr 2009
- ENERGEX Consultation Report: Cooran - Proposed Establishment of a 132/11 kV Zone Substation - 01 Apr 2009
- ENERGEX Project Approval Report: Glenore Grove to Laidley - Establish New 33 kV Feeder - 01 Apr 2009
- ENERGEX Consultation Report: Pimpama East - Proposed Establishment of a 33/11 kV Zone Substation - 01 Apr 2009
- EnergyAustralia Distribution Network Final Report : Development of Supply to the Tomaree Peninsula Area - 30 Mar 2009
- EnergyAustralia Distribution Network Final Report : Development of New 132kV Royal North Shore Hospital Zone Substation - 30 Mar 2009
- ENERGEX Project Approval Report: Grovely - Grovely to Enoggera – Replace Ageing 33 kV Cables F595 and F596 - 27 Mar 2009
- Ergon Energy Corporation Limited Request for Information – Supply to Gayndah Area Emerging Distribution Network Constraint - 25 Mar 2009
- EnergyAustralia Distribution Network Final Report : Newport Load Area 11kV Network Development - 23 Mar 2009
- Transgrid & Country Energy Proposed New Large Transmission Network Asset - Development of Electricity Supply to the NSW Far North Coast - 19 Mar 2009
- EnergyAustralia Distribution Network Final Report : Augmentation of Tanilba Bay zone Substation - 13 Mar 2009
- Energy Australia Application Notice : Development of Gwawley Bay Zone Substation - 13 Mar 2009
- ENERGEX Project Approval Report: Grovely - Upgrade Substation Capacity - 12 Mar 2009
- ENERGEX Consultation Report - South Pine to Hays Inlet: Establish 110 kV Double Circuit Overhead Feeders with One Feeder Energised at 33 kV - 10 Mar 2009
- ENERGEX Consultation Report - Proposed Construction of a 110 kV Feeder from Loganlea to Jimboomba Substation - 06 Mar 2009
- ENERGEX Final Report - Proposed Installation of a 2nd 33/11 kV Transformer with 33 kV and 11 kV Switchgear at Taringa Zone Substation - 06 Mar 2009
- ENERGEX Final Report - Proposed Establishment of a 33/11 kV Zone Substation at Whiteside - 06 Mar 2009
- ENERGEX Final Report - Proposed Establishment of 2 New 110 kV Feeders from Molendinar to Southport and from Molendinar to Surfers Paradise - 06 Mar 2009
- ENERGEX Project Approval Report: Coondoo Creek to Tin Can Bay - Establish New 33kV Feeder - 06 Mar 2009
- ENERGEX Project Approval Report: Noosaville - Upgrade Substation - 06 Mar 2009
- Powerlink Summary of Application Notice : Augmenting the transmission network in South West and South East Queensland - 06 Mar 2009
- Country Energy Consultation Paper for New Large Network Asset: Construction of a Single 132kV Powerline from Mullumbimby to Ballina - 13 Feb 2009
- ENERGEX Project Approval Report: Nambour: Replace 33/11kV Transformer and 11 kV Switchgear - 06 Feb 2009
- ENERGEX Project Approval Report: Mt Gravatt - Install 3rd 33/11 kV transformer and replace 11 kV switchgear - 29 Jan 2009
- EnergyAustralia Annual Electricity System Development Review 2008/2009 (ESDR) and Investing for Future Generations - 23 Jan 2009
- ENERGEX Consultation Report : Proposed Establishment of 2 New 110 kV Feeders from Molendinar (H31) to Southport (SPO) and from Molendinar (H31) to Surfers Paradise (SPD) - 15 Jan 2009
- ENERGEX Consultation Report : Proposed Installation of a 2nd 33/11 kV Transformer with 33 kV and 11 kV Switchgear at Taringa Zone Substation (TRG) - 15 Jan 2009
- ENERGEX Consultation Report : Proposed Establishment of a 33/11 kV Zone Substation at Whiteside (WSE) - 15 Jan 2009
- ENERGEX Project Approval Report: Carindale (Scrub Road) : Upgrade Zone Substation - 12 Jan 2009
- ENERGEX Project Approval Report : Booval – Replace 11 kV Switchgear - 12 Jan 2009
- ENERGEX Final Report : Proposed Network Capacity Augmentation and Reliability Improvement of the Gympie Area - 30 Dec 2008
- ENERGEX Final Report - Proposed new 33/11KV zone substation at Buranda (BDA) - 30 Dec 2008
- ENERGEX Project Approval Report: Bulimba Replace Both Transformers and Install Capacitor Bank - 30 Dec 2008
- ENERGEX Project Approval Report: Newmarket Replace 2 x 15 MV.A 33/11 kV transformers with 2 x 25 MV.A 33/11 kV transformers - 30 Dec 2008
- ENERGEX Project Approval Report: Sandgate Install 3rd 33/11kV Transformer - 30 Dec 2008
- EnergyAustralia Distribution Network Final Report : Development of Rathmines 132/11kV Zone Substation - 24 Dec 2008
- EnergyAustralia Application Notice - Development of Hurstville North Zone Substation - 22 Dec 2008
- EnergyAustralia Application Notice - Replacement of Feeder 900, Leichhardt and Five Dock Zones - 22 Dec 2008
- Ergon Energy Corporation Limited : Supply to Cairns Northern Beaches Area Emerging Distribution Network Constraint - 16 Dec 2008
- EnergyAustralia Distribution Network Final Report – Waverley 11kV Zone Development - 12 Dec 2008
- EnergyAustralia Distribution Network Final Report : Enfield Zone 11kV Western Feeder Development - 11 Dec 2008
- EnergyAustralia Distribution Network Final Report – Drummoyne Zone 11kV Development for Feeders 18, 21 and 26 - 10 Dec 2008
- Integral Energy Final Report for New Large Network Asset – Establishment of Cawdor Zone Substation - 09 Dec 2008
- Ergon Energy Corporation Limited : Supply To Roma Area Emerging Distribution Network Constraint - 09 Dec 2008
- EnergyAustralia Application Notice : Replacement of 132kV Feeders 91L and 91M Peakhurst to Bunnerong and Beaconfield West - 04 Dec 2008
- EnergyAustralia Distribution Network Final Report – Wyong Zone Substation 11kV Distribution Feeder Development - 03 Dec 2008
- EnergyAustralia Distribution Network Final Report – Umina Zone 11kV Distribution Feeder Development - 03 Dec 2008
- Integral Energy Final Report for New Large Network Asset – Establishment of Wilton Parklands Zone Substation - 03 Dec 2008
- ENERGEX Project Approval Report: Brighton – Upgrade 33/11kV Zone Substation - 03 Dec 2008
- ENERGEX Project Approval Report: Toowong – Install new transformer and replace 33 kV switchgear - 03 Dec 2008
- ENERGEX Project Approval Report: Meeandah: Replace 33/11 kV transformers with 3 x 25 MV.A units and install 2 x 5.4 Mvar 11 kV capacitor banks - 25 Nov 2008
- ENERGEX Project Approval Report: Roderick Street: Replace 11kV Switchgear and Transformer Cables - 25 Nov 2008
- Ergon Energy Corporation Limited : Supply to Emerald Area Emerging Distribution Network Constraint - 12 Nov 2008
- ENERGEX Project Approval Report: Doboy: Establish 33/11 kV Zone Substation - 11 Nov 2008
- ENERGEX Project Approval Report: Hendra - Replace existing 7.5/10 MV.A 33/11 kV transformer with 1 x 25 MV.A unit - 11 Nov 2008
- EnergyAustralia Distribution Network Final Report – Replacement of Raymond Terrace 33/11kV Zone Substation - 05 Nov 2008
- EnergyAustralia Distribution Network Final Report – Tomaree Peninsula 11kV Network Capacity - 04 Nov 2008
- EnergyAustralia Distribution Network Final Report - Establish New Potts Hill Zone Substation - 29 Oct 2008
- Integral Energy Final Report for New Large Network Asset – Establishment of West Parramatta Zone Substation - 27 Oct 2008
- EnergyAustralia Distribution Network Consultation Paper – Augmentation of Tanilba Bay Zone Substation - 27 Oct 2008
- ENERGEX Project Approval Report: Caboolture to Toorbul Point - Establish New 33 kV Overhead Feeder - 23 oct 2008
- ENERGEX Project Approval Report: Gatton Install 2nd 60 MV.A Transformer - 23 Oct 2008
- EnergyAustralia Distribution Network Final Report – Tomago STS and Beresfield STS 33kV Capacitor Installation - 23 Oct 2008
- ElectraNet Summary of Final Report : Maintaining Reliable Electricity Supply To Port Lincoln - 20 Oct 2008
- ENERGEX Project Approval Report: Raceview: Install 2 x 33kV capacitor banks and reconfigure 33kV feeders F359, F360, F509 and F510 - 17 Oct 2008
- ENERGEX Project Approval Report: Spring Creek: Establish 33/11kV Substation - 17 Oct 2008
- EnergyAustralia Distribution Network Final Report : Newcastle CBD Zone 11kV Capacitors - 16 Oct 2008
- Powerlink & Transgrid : Potential Upgrade of Queensland / New South Wales Interconnector (QNI) - 13 Oct 2008
- Ergon Energy Corporation Limited Final Report – Supply to South East Townsville Area Emerging Distribution Network Constraint - 08 Oct 2008
- EnergyAustralia Distribution Network Final Report : Replacement of 33kV Feeders to Concord Zone Substation - 07 Oct 2008
- ENERGEX Project Approval Report: Palmwoods Central - Upgrade 33/11 kV Zone Substation - 03 Oct 2008
- EnergyAustralia Distribution Network Final Report : Burwood Zone 11kV Development - 30 Sep 2008
- EnergyAustralia Distribution Network Final Report – Replacement of 33kV Feeders to Riverwood Zone Substation - 24 Sep 2008
- Ergon Energy Corporation Limited : Supply to North West Townsville Area Emerging Distribution Network Constraint - 24 Sep 2008
- Ergon Energy Corporation Limited : Supply to Capricorn Coast Area Emerging Distribution Network Constraint - 24 Sep 2008
- EnergyAustralia Distribution Network Final Report : Pennant Hills 11kV Zone Development - 23 Sep 2008
- ENERGEX Project Approval Report: Belmont: Replace TR1 33/11kV Transformer and 10 x 33 kV Outdoor Circuit Breakers - 23 Sep 2008
- ENERGEX Project Approval Report: Ipswich South : Establish an 11kV feeder to the west with existing circuit breaker - 23 Sep 2008
- ENERGEX Project Approval Report: Lytton Bulk Supply : Install 2nd 33/11 kV Transformer and 11 kV Switchgear - 23 Sep 2008
- ENERGEX Project Approval Report: Lytton Bulk Supply - Install 3rd 80 MV.A 110/33 kV Transformer - 12 Sep 2008
- ENERGEX Project Approval Report: Fisherman's Island: Install New 11 kV Switchroom - 12 Sep 2008
- ENERGEX Project Approval Report: Loganlea – Woodridge: Uprate 33 kV Feeders 407 and 409 - 09 Sep 2008
- ENERGEX Project Approval Report: McLachlan Street: Install Capacitor - 09 Sep 2008
- Ergon Energy Corporation Limited : Request for Information – Supply to Cairns Northern Beaches Area Emerging Distribution Network Constraint - 04 Sep 2008
- Ergon Energy Corporation Limited : Request for Information – Supply to Roma Area Emerging Distribution Network Constraint - 04 Sep 2008
- Ergon Energy Corporation Limited : Consultation & Draft Recommendation – Supply to Emerald Area Emerging Distribution Network Constraint - 04 Sep 2008
- Ergon Energy Corporation Limited : Final Report – Supply to Cannonvale-Airlie Area Emerging Distribution Network Constraint - 04 Sep 2008
- Ergon Energy Corporation Limited : Final Report – Supply to Hervey Bay Area Emerging Distribution Network Constraint - 03 Sep 2008
- Ergon Energy Corporation Limited : Final Report – Supply to Bundaberg Area Emerging Distribution Network Constraint - 03 Sep 2008
- Ergon Energy Corporation Limited : Final Report – Supply to Cairns Area Emerging Distribution Network Constraint - 03 Sep 2008
- Ergon Energy Corporation Limited : Final Recommendation – Supply to Moranbah Area Emerging Distribution Network Constraint - 03 Sep 2008
- ENERGEX Project Approval Report: Cleveland: Construct 33kV Double Circuit Underground Tails and Reconfigure Feeders 375 and 425 - 02 Sep 2008
- ENERGEX Project Approval Report: Boonah: Establish 1x15 MV.A Modular Substation - 02 Sep 2008
- EnergyAustralia Distribution Network Final Report : Cronulla 11kV Zone Development - 01 Sep 2008