Review of Short Term Trading Market

 

 

Purpose of Consultation

The Australian Energy Market Operator is conducting a staged review of the operation and design of the Short Term Trading Market (STTM), STTM demand hubs and adequacy of short and medium term gas market information across the eastern seaboard.

 

Final Reports

AEMO has completed its review of the operation and design of the Short Term Trading Market (STTM), STTM demand hubs and adequacy of short and medium term gas market information across the eastern seaboard.  Below are the final reports from this review:

Final Report – Review of the STTM Operations and Demand hubs
30 Mar 2012 | filename: 1130-0710.pdf


Final Report – Review of the Gas Market Information on the Gas Bulletin Board
30 Mar 2012 | filename: 1130-0711.pdf


Summary of Stakeholder Submissions to Draft Reports
30 Mar 2012 | filename: 1130-0712.pdf


 

Submissions on Stage 2 Draft Report


 
 

 
 

 
 
 
 

 

Stage 2 Draft Report

AEMO is conducting a staged review of the operation and design of the Short Term Trading Market (STTM), STTM demand hubs and adequacy of short and medium term gas market information across the eastern seaboard. 

Taking into account stakeholder feedback to date, AEMO has released its draft considerations. The following reports have been released for stakeholder consultation.

STTM Design and demand hubs - Draft Report
19 Dec 2011 | filename: 1130-0681.pdf


Gas Market Information - Draft Report
19 Dec 2011 | filename: 1130-0682.pdf


Attachment A - Summary of stakeholder comments
19 Dec 2011 | filename: 1130-0683.pdf


 

AEMO is inviting comment on the Draft Reports by 3 February 2012.   

Submissions should be sent via email to sttmcf.correspondence@aemo.com.au and addressed to Ms Violette Mouchaileh, Senior Manager—STTM Development, Market Performance.  

 


 

Stage 1 Consultation Submissions


 




 

 




 

First Stage Consultation Paper

The discussion paper below presents analysis and considerations for stakeholders to comment. AEMO welcomes all stakeholder views on any aspect related to the matters covered in this paper.  

AEMO is inviting comment on this discussion paper by 23 September 2011.

Submissions should be sent via email to sttmcf.correspondence@aemo.com.au and addressed to Ms Violette Mouchaileh, Senior Manager—STTM Development, Market Performance.  

STTM Reviews Phase 1 - Discussion Paper
16 Aug 2011 | filename: 1130-0558.pdf


 

STTM Phase 1 Review Presentation

ON August 30 2011, AEMO held a workshop describing the broad process that would be undertaken through the STTM reviews.

The slides for that workshop are provided below:

STTM Reviews Phase 1 - Discussion Paper (Slides)
11 Nov 2011 | filename: 1130-0660.pdf


 

Workshops

Following a review of the submissions received in response to the STTM Reviews Phase 1 Discussion Paper, AEMO received a wide spectrum of positions from industry with some degrees of similarity. As part of consolidating the comments and developing a consistent view, AEMO is holding workshops during November and December 2011.

The information circulated to participants for these workshops and notes from the workshops have been posted here.

 

Overview and Timetable

In addition to the public consultation process, AEMO will engage directly with stakeholders throughout the review at its consultative forums and on a one-to-one basis as needed.

AEMO aims to complete this review by producing a final report setting out its recommendations by 31 March 2012.

The implementation of any proposed recommendations or progression of issues arising from this review will be outlined in the final report.

Table 1: Consultation timetable

Process

Date

First Stage Consultation Paper—Open for consultation

16 August 2011

First Stage Consultation Paper—Closing date for submissions

23 September 2011

Draft Report—Open for consultation

19 December 2011

Draft Report—Closing date for submissions

3 February 2012

AEMO releases Final Report

30 March 2012