NEM Metrology Procedure: Part A v3.0 and Part B v5.0 Consultation

AEMO has completed the consultation on:

  • Metrology Procedure: Part A National Electricity Market version 3.0; and
  • Metrology Procedure: Part B: Metering Data Validation, Substitution and Estimation Procedure for Metering Types 1 – 7 version 5.0.

The consultation was conducted under clause 7.14.1 of the National Electricity Rules (Rules) in accordance with the Rules consultation procedures detailed in clause 8.9 of the Rules.

Scope of Metrology Procedure Changes

The changes under the consultation were developed as a result of the AEMC’s Final Rule Determination:
National Electricity Amendment (Provision of Metering Data Services and Clarification of Existing Metrology Requirements) Rule 2010.

This Rule change became effective on 16 December 2010.

The Rule change introduced Metering Data Providers (MDP) into the Rules framework and transferred responsibility for metering data services from AEMO to the Responsible Person.  Restructuring of Chapter 7 of the Rules and amendment, removal or creation of various metering data terms (Chapter 10 of the Rules) to ensure consistency and clarity in the Rules were also introduced

The key features of the Rule change are:

  • The creation of a new category of metering service provider: Metering Data Provider, including the accreditation, registration and dispute resolution processes to be applied.
  • The transfer of responsibility for metering data services to the Responsible Person.  For connection points where the TNSP is the Responsible Person, AEMO will retain responsibility for the provision of metering data services.
  • Creation of service level procedures in the Rules that will apply to Metering Providers and Metering Data Providers.
  • Changes to metering data terms for consistent application across the Rules.
  • Restructuring of clauses in Chapter 7 to facilitate a more coherent organisation of the Rules pertaining to metrology.

This consultation also addressed the issue of duplication of Rules provisions in the Schedules of Metrology Procedure: Part A, the result of which are:

  • Obligations and requirements that are not covered in the Rules will be removed from the Schedules and relocated to a relevant section within the Metrology Procedure;
  • Obligations and requirements that are covered in the Rules will be removed from the NEM Metrology Procedure.
Matter Under Consultation

The changes to the Metrology Procedure are indicated in the documents titled:

  • Metrology Procedure Part A v3.0 Part B v5.0 Change Pack – Final Determination and Report
  • Metrology Procedure: Part A v3.0 Final Determination Change Marked
  • Metrology Procedure: Part B v5.0 Final Determination Change Marked
Consultation Process

The following table contains an outline of the consultation process, including key dates.

 

Process

Date

Closing date for submissions received in response to this Notice of First Stage of Rules Consultation

6 May 2011

Publication of the Draft Determination and Report and invitation to make submissions in response to the Draft Determination

1 June 2011.

Closing date for submissions received in response to the Draft Determination and Report

29June 2011.

Publication of the Final Determination and Report

29 July 2011.

Effective Date of Metrology Procedure

31 October 2011.

 

Submissions received on the Draft Determination

AEMO received nine submissions from participant organisations on the second round of consultation.

Following review of these submissions and consultation with the Metrology Reference Group, a Final Determination was developed.

Date of notice

The Final Determination was issued on 29 July 2011.

The effective date of these Procedures is 31 October 2011.

Please direct all comments to Roy Kaplan, Manager Metrology Regulation, roy.kaplan@aemo.com.au.

 

Metrology Procedure: Part A and Part B - Draft Final Determination and Report
29 Jul 2011 | filename: 0648-0083.pdf
Metrology Procedure Part A v3.0 : Final Determination (Clean)
29 Jul 2011 | filename: 0640-0043.pdf
Metrology Procedure Part A v3.0 : Final Determination (Change Marked)
29 Jul 2011 | filename: 0648-0084.pdf
Metrology Procedure Part B v5.0 : Final Determination (Clean)
29 Jul 2011 | filename: 0640-0044.pdf
Metrology Procedure Part B v5.0 : Final Determination (Change Marked)
29 Jul 2011 | filename: 0648-0085.pdf

 

 


SECOND STAGE OF CONSULTATION
NEM - Notice of Second Stage of Consultation - Metrology Procedure
01 Jun 2011 | filename: 0648-0061.pdf
Metrology Procedure Part A and Part B  Draft Determination and Report
01 Jun 2011 | filename: 0648-0067.pdf
Metrology Procedure Part A v3.0 Part B v5.0 : Second Stage of Consultation - Participant Response Pack
01 Jun 2011 | filename: 0648-0062.doc
Metrology Procedure Part A v3.0 : Draft Determination (Clean)
01 Jun 2011 | filename: 0648-0063.pdf
Metrology Procedure Part A v3.0 : Draft Determination (Change Marked)
01 Jun 2011 | filename: 0648-0064.pdf
Metrology Procedure Part B v5.0 : Draft Determination (Clean)
01 Jun 2011 | filename: 0648-0065.pdf
Metrology Procedure Part B v5.0 : Draft Determination (Change Marked)
01 Jun 2011 | filename: 0648-0066.pdf

 

SUBMISIONS ON THE SECOND STAGE
ActewAGL (late submission)
  Ausgrid
Citipower / Powercor / ETSA
  Energex
Ergon Energy
  Origin
SP AusNet
  TransGrid
United Energy Distribution
 

 


FIRST STAGE OF CONSULTATION
NEM - Notice of First Stage of Consultation - Metrology Procedure
28 Mar 2011 | filename: 0640-0028.pdf
Metrology Procedure Part A v3.0 Part B v5.0 Change Pack - Initial Consultation v1.0
28 Mar 2011 | filename: 0640-0029.pdf
Metrology Procedure Part A v3.0 Part B v5.0 Participant Response Pack
28 Mar 2011 | filename: 0640-0030.doc
Metrology Procedure Part A v3.0 Draft (Change Marked)
28 Mar 2011 | filename: 0640-0031.pdf
Metrology Procedure Part A v3.0 Draft (Clean)
28 Mar 2011 | filename: 0640-0032.pdf
Metrology Procedure Part B v5.0 Draft (Change Marked)
28 Mar 2011 | filename: 0640-0033.pdf
Metrology Procedure Part B v5.0 Draft (Clean)
28 Mar 2011 | filename: 0640-0034.pdf

 

SUBMISIONS ON THE FIRST STAGE
ActewAGL
  AGL
Ausgrid
  Endeavour Energy
Jemena
  Origin
SP AusNet (part 1)
  SP AusNet (part 2)
TransGrid
  United Energy Distribution