Reports and Documents

A list of reports and documents including the AEMO Annual Report 2011, AEMO Energy Update 2012, NEM Weekly Review  as well as Planning and EEAP Reports are available here.

Carbon Price - Market Review

This report summarises the outcomes in the east coast wholesale electricity and gas markets over the first months of carbon pricing.


Read More

Energy Adequacy Assessment Projection (EAAP)

Reports investigating the potential impact of the drought (within eastern and south-eastern Australia) on electricity supplies in the National Electricity Market.


Read More

Frequency and Time Error Monitoring

The Frequency and Time Error Monitoring Reports are prepared by AEMO on a monthly basis.  The reports describe the power system frequency and time error performance compared to the Frequency Operating Standards published by the Reliability Panel.


Read More

Market Event Reports

A listing of the Market Event reports published by AEMO.


Read More

National Electricity Forecasting

The NEFR provides annual energy and maximum demand forecasts (on a consistent basis) over the next 10 years for each of the five regions in the National Electricity Market, namely New South Wales (including ACT), Queensland, South Australia, Tasmania, and Victoria.


Read More

Network Operations

Network Operations reports such as the 'Interconnector Quarterly Performance Reports', the 'Increase in the Maximum Transfer Capability of the Heywood Interconnection from SA to VIC', and the 'South Australian Interconnector Feasibility Study' are available here.


Read More

Power System Adequacy

The PSA looks at scenarios which assess key aspects of the power system's capability and takes into account the Commonwealth Government's Clean Energy Future Plan announced on 10 July 2011.


Read More

Power System Operating Incident Reports

AEMO conducts investigations of 'unusual power system events' within the NEM.


Read More

Power System Operations Event Reports

Reports published by AEMO on Power System Operations Events.


Read More

Price Revision Reports

Reports on Price Revisions.


Read More

Pricing Event Reports

AEMO reports on electricity market outcomes for events with a regional reference price exceeding $500 per MWh or below -$100 per MWh in a 30-minute trading interval.  These reports are brief and posted within 4 business days of the event.


Read More

Progress on Operating Incident Recommendations


Read More

Reports providing background information related to directions issued to Participants.


Read More

Security and Reliability

Reports published by AEMO on Security and Reliability matters affecting the NEM.


Read More

Vision 2030 - Update

In 2005 VENCorp produced Vision 2030, which provided a 25 year vision for Victoria's energy transmission networks. The Vision 2030 Update was published on 1 May 2009.


Read More

Weekly NEM Review Bulletin

The Weekly NEM Review Bulletin summarises the outcomes for the previous week.


Read More