Constraint Master Class – 70 and 71 limit

 

The following video presentation details how the Constraint Equation N>>N-NIL__S which manages the loading on the Mt Piper to Wallerawang (70 and 71) 330kV lines in NSW. It also provides techniques on how to analyse other types of constraint equations in the NEM.

AEMO intends to produce further videos explaining how constraint equations work. AEMO welcomes suggestions from participants for future topics.

Constraint Master Class for 70+71 line limit
  • Constraint Master Class - 70 and 71 limit (mp4 version. Right click on link to download)

For further information or comments on this video or suggestions for topics for future videos, please contact: Ben Blake, Electricity System Operations Planning & Performance.