Electricity

AEMO operates Australia’s National Electricity Market (NEM), the worlds largest interconnected power system. NEM infrastructure is comprised of both state and privately owned assets and is managed by a variety of entities under the overall direction of AEMO

See all

Electricity

Subscribe

Electricity Consultations

Accepting Submissions Updated Convenor Consultation Initiated
Accepting Submissions Updated AEMO NEM Heywood interconnector upgrade - program for inter-network tests" 11-Nov-15
Accepting Submissions Updated AEMO NSP Ausgrid Distribution Asset Final Report: Pelican Zone 11kV Development" 11-Jan-13
Accepting Submissions Updated AEMO NSP Ausgrid Distribution Asset Consultation Paper Development of Alexandria 132/33kV Sub Transmission Substation " 15-Aug-13
Accepting Submissions Updated AEMO NEM Proposal to Publish Connection Point Demand Data" 03-Sep-12
Accepting Submissions Updated AEMO NEM Victorian Reliability Support_Project Assessment Conclusions Report" 03-May-12
Accepting Submissions Updated AEMO NEM Data and model requirements for generating systems less than 30 MW" 26-Nov-12
Accepting Submissions Updated AEMO NSP Energex Final Report for proposed augmentation – Establish New Feeder Tee into Existing F3901: T136 Abermain - KBN Karrabin - ABY Amberley" 14-Nov-12
Accepting Submissions Updated AEMO NSP Ausgrid Distribution Network Final Report – Sefton Zone Substation 11kV Panel 16, 34, 35 Feeders" 17-Jan-13
Accepting Submissions Updated AEMO NSP Ausgrid Distribution Network Final Report – Thornton Zone Substations 11kV Development" 17-Jan-13
Accepting Submissions Updated AEMO NEM MSATS Procedure v3.7 Consultation" 06-Feb-13
Accepting Submissions Updated AEMO NEM B2B Procedure v1.9 Consultation" 07-Nov-12
Accepting Submissions Updated AEMO NEM System Restart Ancillary Services 2013 Consultation" 25-Jan-13
Accepting Submissions Updated AEMO NSP Ergon Energy Corporation Final Recommendation South Mackay area" 31-Jan-14
Accepting Submissions Updated AEMO NSP Powerlink Publication of PACR Maintaining a Reliable Electricity Supply to Bowen Basin" 24-Jan-13
Accepting Submissions Updated AEMO NEM Metrology Procedure Part A and Part B Consultation on the Introduction of FRC in Tasmania" 04-Mar-13
Accepting Submissions Updated Dalrymple Substation Upgrade Project Specification Consultation Report Summary" 12-Apr-13
Accepting Submissions Updated AEMO NSP Ausgrid Distribution Network Final Report Raymond Terrace Zone Substation 11kV Feeders" 15-Apr-13
Accepting Submissions Updated AEMO NSP Ausgrid Distribution Network Final Report Rathmines Zone Substation 11kV Feeders" 15-Apr-13
Accepting Submissions Updated AEMO NEM Value of Customer Reliability Issues Paper" 11-Mar-13
Accepting Submissions Updated AEMO NEM Service Level Procedure: Metering Data Provider Services Category D and C for Metering Installation Types 1, 2, 3, 4, 5, 6 and 7" 15-Apr-13
Accepting Submissions Updated AEMO NSP Ergon Energy Corporation Limited - Reg Test Consultation - Consultation & Draft Recommendation - Central Toowoomba area" 04-Apr-13
Accepting Submissions Updated AEMO NEM Energy Conversion Model for Solar Forecasting" 12-Apr-13
Accepting Submissions Updated AEMO NEM Amendment to the Energy Conversion Model Guidelines (‘the ECM Guidelines’)" 08-Feb-13
Accepting Submissions Updated AEMO NEM Planning Studies 2013 Consultation" 30-Jan-13
Accepting Submissions Updated AEMO NEM Congestion Information Resource Guidelines Consultation 2013" 15-Feb-13
Accepting Submissions Updated AEMO NEM Value of Customer Reliability Directions Paper" 03-Jun-13
Accepting Submissions Updated AEMO NEM MSATS Procedures v3.8 Consultation" 02-Apr-13
Accepting Submissions Updated AEMO NEM B2B Procedures v2.0 Consultation" 02-Apr-13
Accepting Submissions Updated AEMO NEM NEM RoLR Processes v1.3 Consultation" 09-Apr-13
Accepting Submissions Updated AEMO NSP Ergon Energy Corporation Limited - Reg Test Consultation - Consultation & Draft Recommendation - Charleville area" 23-May-12
Accepting Submissions Updated IIR IN006/11 – Updates to FRC HUB Terms and Conditions" 03-Jul-13
Accepting Submissions Updated AEMO NSP AEMO Governance Review" 13-Aug-13
Accepting Submissions Updated Wholesale Market Maintenance Planning Procedures" 19-Aug-13
Accepting Submissions Updated AEMO NSP Energex Distribution Annual Planning Report 2013-14 to 2017-18" 30-Sep-13
Accepting Submissions Updated AEMO NEM Meter Data File Format Specification NEM12 and NEM13" 01-Aug-13
Accepting Submissions Updated AEMO NEM Metrology Procedure Part A v3_20 and Part B v5_20 Consultation SGA and Corrections" 25-Jul-13
Accepting Submissions Updated AEMO NSP Potential New Large Network Asset Investment: Augmentation of Electricity Supply to the Quirindi area of NSW (Final Report)" 23-Aug-13
Accepting Submissions Updated AEMO NSP SA Power Networks - Publication of DAPR" 06-Nov-13
Accepting Submissions Updated AEMO NEM Value of Customer Reliability Statement of Approach" 12-Nov-13
Accepting Submissions Updated ElectraNet Publication of Project Assessment Conclusion Report Dalrymple Substation Upgrade" 05-Dec-13
Accepting Submissions Updated AEMO NSP SA Power Networks Publication of 9 Screening Test Reports" 19-Dec-13
Accepting Submissions Updated AEMO NEM MSATS Procedures v3.9 Consultation" 20-Dec-13
Accepting Submissions Updated AEMO NSP Ergon Energy Final Report for the Southern Atherton Tablelands Area" 11-Dec-13
Accepting Submissions Updated AEMO NSP Ergon Energy Corporation Limited - Regulatory Test Consultation - Rural area SW of Kingaroy" 27-Nov-13
Accepting Submissions Updated AEMO NEM MSATS Procedures v4_0 Consultation" 23-Jan-14
Accepting Submissions Updated AEMO NSP Ergon Energy Regulatory Notice of Withdrawal of Final Recommendation Emerald" 09-Oct-13
Accepting Submissions Updated AEMO NSP FINAL REPORT – Supply to Boyne Island - Tannum Sands area - Proposed upgrade to Boyne Residential Substation " 11-Dec-13
Accepting Submissions Updated AEMO NEM Settlements Residue Auction Rules" 20-Jan-14
Accepting Submissions Updated AEMO NSP Ergon Energy Corporation Limited Request for Information - Supply to Gracemere" 19-Dec-13
Accepting Submissions Updated AEMO NEM Notice of Consultation Business to Business B2B Procedures Version 2_1" 17-Jan-14
Accepting Submissions Updated AEMO NSP Consultation Paper for Marsden Park Zone Substation January 2014" 20-Jan-14
Accepting Submissions Updated AEMO NEM Notice of Consultation: Unmetered Load Guideline Final Determination" 11-Feb-14
Accepting Submissions Updated AEMO NSP Energex Final Report for proposed augmentation Establish New 132_11 kV Zone Substation Birtinya" 04-Dec-13
Accepting Submissions Updated IT Change Management Consultation" 03-Apr-14
Accepting Submissions Updated AEMO NSP Ergon Energy Corporation Limited Regulatory Test Consultation Final Recommendation report Gladstone South" 18-Dec-13
Accepting Submissions Updated 2014 Congestion Information Resource consultation" 12-Mar-14
Accepting Submissions Updated Project Assessment Draft Report regarding the Development of the Queensland NSW Interconnector" 31-Mar-14
Accepting Submissions Updated AEMO NSP Energex Final Report for proposed augmentation – Establish New 33/11 kV Zone Substation Fisherman Island Bulk Zone" 19-Feb-14
Accepting Submissions Updated AEMO NSP Ergon Energy Corporation Limited Regulatory Test Consultation - Final Recommendation report - Stanthorpe" 13-Nov-13
Accepting Submissions Updated AEMO NEM MSATS Procedures v4.1 Consultation" 19-May-14
Accepting Submissions Updated AEMO NSP Ergon Notice of Withdrawal of Final Recommendation Maryborough and Hervey Bay" 27-Jun-14
Accepting Submissions Updated AEMO NSP TransGrid Publishes TAPR 2014" 01-Jul-14
Accepting Submissions Updated AEMO NEM Credit Limit Procedures V2 Consultation" 02-May-14
Accepting Submissions Updated AEMO NEM Review of Methodology for calculating Forward Looking Transmission Loss Factors - Final Determination" 16-Jul-14
Accepting Submissions Updated 2014 System Restart Ancillary Services Consultations" 27-Jun-14
Accepting Submissions Updated ElectraNet Baroota Substation Upgrade Project Specification Consultation Report" 15-May-14
Accepting Submissions Updated AEMO NEM Changes to System Operating Procedure SO_OP_3707" 26-Jun-14
Accepting Submissions Updated AEMO NEM Settlements Residue Auction Rules: Maximum Units and Proportions" 07-Aug-14
Accepting Submissions Updated AEMO NEM Notice of Consultation Business to Business B2B Procedures Version 2.2" 21-Jul-14
Accepting Submissions Updated AEMO NEM Carbon Dioxide Equivalent Intensity Index Procedures Review" 03-Sep-14
Accepting Submissions Updated AEMO NEM Energy Consumers Australian Fee Collection Methodology" 10-Oct-14
Accepting Submissions Updated AEMO NSP Ergon Energy Corporation Limited Regulatory Test Consultation Gracemere area - Addendum" 10-Sep-14
Accepting Submissions Updated AEMO NEM Project Assessment Conclusions Report Development of the Queensland to NSW Interconnector " 13-Nov-14
Accepting Submissions Updated AEMO NEM NEM – Final Determination – Metrology Procedure: Part A and Part B v5.30 " 20-Nov-14
Accepting Submissions Updated AEMO NEM Second Stage - Notice of Consultation Meter Churn Package" 20-Nov-14
Accepting Submissions Updated AEMO NEM Optional Firm Access Draft Report" 23-Dec-14
Accepting Submissions Updated AEMO NEM 2015 Planning Studies Consultation" 29-Jan-15
Accepting Submissions Updated AEMO NEM SRAS Regional Benefit Ancillary Services Procedures Consultation" 30-Apr-15
Accepting Submissions Updated IN004/15 NSW ACT RMP and GIP changes for Wagga Wagga and Tamworth: Final AEMO Decision" 29-Apr-15
Accepting Submissions Updated AEMO NEM Metering Data Provision Procedures" 30-Apr-15
Accepting Submissions Updated AEMO NEM Reliability standard implementation guidelines" 15-Jun-15
Accepting Submissions Updated AEMO NEM Issues Paper Energy Adequacy Assessment Projection Reporting" 13-Jul-15
Accepting Submissions Updated AEMO NEM 2015 Congestion Information Resource Guidelines Consultation" 07-May-15
Accepting Submissions Updated AEMO NEM Electricity Markets - Structure of Participant Fees" 11-Nov-15
Accepting Submissions Updated AEMO NEM Reliability Standard Implementation Guidelines" 30-Oct-15
Accepting Submissions Updated AEMO NEM 2016 Consultation Paper for the National Transmission Network Development Plan" 29-Jan-16
Accepting Submissions Updated AEMO NEM Energy Conversion Model (ECM) Guidelines Consultation – Wind and Solar Farms" 18-Mar-16
Accepting Submissions Updated AEMO NEM Power of Choice - AEMO Procedure Changes (Package 1)" 22-Apr-16
Accepting Submissions Updated TransGrid Publishes TAPR 2015" 01-Jul-15
Accepting Submissions Updated AEMO NSP TransGrid Publishes APR 2013" 01-Jul-13
Accepting Submissions Updated Ausgrid Dual Function Asset Alexandria STS Final Report" 28-Jul-15
Accepting Submissions Updated AEMO NSP Ausgrid publishes combined Distribution and Transmission Annual Planning Report 2013" 23-Dec-13
Accepting Submissions Updated AEMO NSP Ausgrid Distribution Asset Consultation Paper - Projected Distribution System Limitations on circuits 9SA and 9SB/1 supplying the Sydney Inner Metropolitan Load Area " 16-Dec-13
Accepting Submissions Updated 2014 Planning Studies Consultation" 30-Jan-14
Accepting Submissions Updated Electricity Markets - Structure of Participant Fees"
Accepting Submissions Updated AEMO NSP Baroota Substation Upgrade Project Assessment Draft Report" 15-Jun-15
Accepting Submissions Updated AEMO NSP Consultation Paper for PR673 Liverpool City Centre Distribution Network"
Accepting Submissions Updated AEMO NSP Ausgrid Distribution Network Final Report – New 11 kV feeder from Cardiff Zone Substation to Warners Bay"
Accepting Submissions Updated AEMO NSP Ausgrid Publishes Distribution and Transmission Annual Planning Report 2014" 19-Dec-14
Accepting Submissions Updated AEMO NSP Ausgrid Publishes Transmission Annual Planning Report 2013" 01-Jul-13
Loading...
Accepting Submissions  Accepting Submissions     Updated  Recently Updated