Essential Energy has identified a number of limitations on the Essential Energy distribution network supplying the Temora and Junee area of south western NSW.
Given that network options to correct these limitations include consideration of significant works on the subtransmission system and would be a new large network asset investment, Essential Energy is undertaking consultation on options to correct them.
As the third and final stage of this consultation, and in accordance with Clause 5.6.2 (Network Development) and Section 8.9 (Rules Consultation Procedures) of the National Electricity Rules, Essential Energy intends to proceed with the recommendation concluded in the Final Report.
Information on the network, the network loads, the identified constraints, the options identified to address them, the economic assessment of those options and submissions on the Consultation Information Report is provided in a Draft Report and subsequent Final Report, which is published in conjunction with this Consultation Notice at:
http://www.essentialenergy.com.au/content/Network-Investment-Consultation-Reports
Written disputes concerning the matter should be directed by email to:
Submissions must be received no later than Friday 17th August 2012.